| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Klamath Co. Museum Sidewalk Replace 3/2/21 2pm Removal of existing sidewalk and construction of new sidewalk, raised concrete planters/benches and ... | 02/16/2021 | 03/02/2021 | |
| North Eugene HS Bid Set C 3/12/21 2pm The scope of work includes all building components (less structural steel and CMU), including but no... | 03/12/2021 | ||
| 7-11 Convenience Store 3/2/21 2pm New ground up 7-11 Convenience store. ALL SCOPES OF WORK ARE BIDDING. Please note sheet A0.2 for Res... | 03/02/2021 | ||
| I5 MP85 Culvert Repair *Cancelled* Culvert Repair located on Interstate 5 at MP 85.95, including the following: Work Zone Traffic Contr... | 02/25/2021 | ||
| Rice Creek Bridge Replacement 3/26/21 2pm Rice Creek Bridge is located at Milepost 1.41 on Willis Creek Rd (County Road #43), near the city of... | 03/26/2021 | ||
| Replace Bridge Hinkle Creek 3/26/21 2pm Hinkle Creek Bridge is located at Milepost 0.04 on Hinkle Creek Rd (County Road #281), near the city... | 03/26/2021 | ||
| 2021 Spring Street Projects 3/4/21 2pm The Project is for roadbed reconstruction, asphalt overlay, and removal of old asphalt at various re... | 02/16/2021 | 03/04/2021 | |
| NATVET TI 3/10/21 4pm Veterinarian tenant improvement project of 6,149gsf on the first floor of an existing two story reta... | 03/10/2021 | ||
| Bridge Replacement McCullough Creek 3/26/21 2pm The project scope includes the design and construction of a new bridge to replace the existing bridg... | 03/26/2021 | ||
| Liquid Roads Ultra Project 3/3/21 2pm Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s esti... | 03/03/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.