| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Washington St. Sewer Replace 3/25/21 2pm Construction of an 8 inch sewer main, manholes, sanitary sewer laterals and asphalt concrete paving. | 03/16/2021 | 03/25/2021 | |
| Mae Richardson Upgrades 3/18/21 2pm Remodel of 44,000+ Elementary School including: Site upgrades (expanding parking lot, install landsc... | 03/18/2021 | ||
| A & E Admin/Ops Building Upgrades 4/14/21 3pm The purpose of this document is to provide interested parties with information to enable them to pre... | 04/14/2021 | ||
| Roadway Striping Rumble Strip Install 3/30/21 10am The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement mark... | 03/30/2021 | ||
| Oil Rock, Sanding Rock Various Sites 3/23/21 10am The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” –... | 03/23/2021 | ||
| Elkton Elementary Phase II 4/1/21 3pm Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is a p... | 04/01/2021 | ||
| GP Oil Stop & Car Wash 3/17/21 2pm Ground up construction of car wash and oil stop. Specs are included with the plans. | 03/17/2021 | ||
| Chemult Maintenance Shop Asbestos 3/24/21 11am Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or abat... | 03/24/2021 | ||
| Windsor Cir. 36th & 38th Pavement 3/19/21 2pm Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay on... | 03/19/2021 | ||
| Half Moon Bay Shop Flatwork 3/30/21 2pm Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prepare... | 03/12/2021 | 03/30/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.