| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Runway Rehab & Taxiway Relocation 2/25/21 2:30pm Schedule I (Federal) work includes mill and asphalt overlay (P-401) of Runway 16L-34R and portions o... | 02/04/2021 | - | |
| Library Chiller 2/24/21 4pm Central Oregon Community College (COCC) requests proposals from qualified vendors for the College... | 02/03/2021 | 02/24/2021 | |
| Nonpareil WTP Improvements 2/24/21 2pm a. Intake building improvements, including new air compressor, new actuated valve, electrical improv... | 02/09/2021 | 02/24/2021 | |
| Trinity Way Waterline Extension 2/16/21 2pm Construction of an 8-inch water main, a 1” copper water service, trenching and patching, and 30-feet... | 02/16/2021 | ||
| South Barney Sewer Project 2/10/21 4pm The Project consists of the construction of approximately 1,575 feet of 8-inch sewer main, 7 manhole... | 02/10/2021 | ||
| Pedestrian Crossing Improvements 2/16/21 2:00pm Mobilization, traffic control, removing existing sidewalk and installing bulb-outs, curb ramps, new ... | 02/16/2021 | ||
| Remove & Replace Rooftop Griffin Creek 2/17/21 2pm Establish a firm fixed price contract with one qualified source to perform removal, disposal and rep... | 01/29/2021 | 02/17/2021 | |
| Gangnes Dr. Sewer Realignment 2/9/21 2:15pm The construction of 1,505 feet of 8 inch sanitary sewer pipe along with associated service laterals ... | 02/09/2021 | ||
| Middletown PRV Improvements 2/18/21 4pm This project will include the removal of an existing check valve and the construction of a new press... | 02/18/2021 | ||
| Installation of ADA Operators 2/8/21 3pm Supply and install all required components needed to add (7) ADA Operators and (14) Hands Free ADA O... | 01/27/2021 | 02/08/2021 | |
| Title | Site Walk Through | Deadline |