| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Lincoln St. Curb Ramp Improvements 3/4/21 2pm The work proposed consists of ADA improvements and associated work in the City of Roseburg. ADA impr... | 03/04/2021 | ||
| Fisheries Modular Building 3/8/21 4pm The facility will be replaced with a customized space that is a minimum of 1,800sqft for offices, la... | 03/08/2021 | ||
| Multisite Painting 3/4/21 2pm Preparing and painting the exterior of entire school buildings and site elements, and application of... | 02/17/2021 | 03/04/2021 | |
| Geocomposite Short Mountain Landfill 3/3/21 3pm Lane County is seeking quotes for 2-sided Geocomposite (Geonet heat bonded between two layers of non... | 03/03/2021 | ||
| OR238 & OR62 Curb Ramps 3/4/21 9am The Work to be done under this Contract consists of the following: 1. Install and remove temporary t... | 03/04/2021 | ||
| US101 MP 358 Chetco Bridge Tree & Brush 2/17/21 2pm Fall, chip, and remove ALL trees and brush larger than 1″ in diameter in the flagged area on t... | 02/17/2021 | ||
| Parking Lot Maintenance & Repair 3/2/21 3pm Asphalt parking lot crack filling, sealcoating, asphalt patching, and ADA symbol marking and line st... | 02/23/2021 | 03/02/2021 | |
| Britt Hall Commissioning Services 2/25/21 3pm The following systems and assemblies (including all associated equipment, features and components) w... | 02/25/2021 | ||
| I-5 Brushing MP 79 2/16/21 2pm ESB project for clearing, trimming and removing trees, brush, and all other vegetation to improve si... | 02/16/2021 | ||
| B Street Sidewalk Infill 2/25/21 3pm THE ENTIRE PROJECT WILL CONSIST OF THE INSTALLATION OF APPROXIMATELY 15,200 SF OF SIDEWALK AND DRIVE... | 02/18/2021 | 02/25/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.