| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Metal Roof Installation 10/7/20 4pm
Installation of insulation and metal roof with a 4/12 pitch on a 40x60x24 metal building. All m... |
10/07/2020 | ||
|
Leachate Pond & Floating Cover Replace 12/16/20 10am
Remove and dispose of existing floating cover system into onsite landfill; remove estimated 500,0... |
12/16/2020 | ||
|
South Hills 4th Level Reservoir 11/12/20 2pm
Construction of a new South Hills 4th Level Reservoir, a 0.46-million-gallon (MG) gro... |
10/07/2020 | 11/12/2020 | |
|
ZIRC Annex Abatement & Demolition 10/13/20 2pm
Asbestos Abatement and demolition of a 20′ x 50′ metal building located on the North ... |
10/13/2020 | ||
|
36th Avenue Water Main Replacement 10/20/20 2pm
Water main replacement on 36th Ave Crest Dr to Monroe St. in Eugene OR. |
10/20/2020 | ||
|
Weekend Beer Company 10/13/20 2pm
New construction of pre-engineered metal building with design/build MEP systems. Work also includ... |
10/13/2020 | ||
|
Huestis Hall Deferred Maintenance 10/16/20 2pm
Preconstruction and Construction services for the Huestis Hall Deferred Maintenance Project encom... |
10/06/2020 | 10/16/2020 | |
|
Pruner Industrial Way Traffic Control Project 10/30/20 2pm
The project scope includes two phases. Phase 1 consists of engineering design of the chosen tra... |
10/30/2020 | ||
|
ESB Project 2020 D7 North Douglas Curbing 10/13/20 3pm
Removing existing curbing and constructing new concrete drainage curbing at various locations alo... |
10/13/2020 | ||
|
Family Mart Shell N Medford 4/9/21 4pm
Current construction of new Shell gas station and convenience store at 70 Rossanley in Medford. R... |
04/09/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.