| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| MSDEC Remodel Early Work Package 6/15/21 2pm Selective Demolition and Hazmat Abatement, structural steel framing, rough carpentry, wood casework,... | 06/02/2021 | 06/15/2021 | |
| Building 84 Shell Only 5/28/21 4pm Shell only construction of a 10,350 sf commercial building including concrete, electrical, HVAC, plu... | 05/28/2021 | ||
| Exterior Paint Soccer Park Buildings 6/3/21 2pm The Contractor shall be responsible for all preparation work for paint; which includes but is not li... | 05/26/2021 | 06/03/2021 | |
| COID Pilot Butte Canal Construction Survey 6/29/21 2pm All survey work shall be conducted by or under the supervision of a Registered Professional Land Sur... | 06/29/2021 | ||
| COID Pilot Butte Canal Pipe Coating 6/29/21 2pm Steel Pipe Coating Services. | 06/10/2021 | 06/29/2021 | |
| COID Pilot Butte Canal Pipe Welding 6/29/21 2pm Steel Pipe Welding Services | 06/10/2021 | 06/29/2021 | |
| Cast In Place Concrete, Bridge Structure 6/29/21 2pm Cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, place... | 06/10/2021 | 06/29/2021 | |
| 3 Phase Power Install 6/1/21 5pm The installation of 3-phase power to an existing refrigeration unit at the Dept. of Natural Resource... | 06/01/2021 | ||
| Yreka Clinic Lighting Upgrades 6/3/21 5pm Deleting the program light system currently installed in the Karuk Medical/Dental clinic located at ... | 06/03/2021 | ||
| D7 North Douglas MIM Paving 5/26/21 2pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 05/26/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.