| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Westmoreland Seismic Rehab 5/18/21 2pm Seismic Rehab involving demo, metal fabrication, carpentry, framing, casework, roofing, insulation, ... | 04/14/2021 | 05/18/2021 | |
| I-5 Culvert MP 171 Repair 4/28/21 2pm Perform invert paving on a large culvert under I-5 in Lane County for the benefit of the Oregon Depa... | 04/28/2021 | ||
| OR66 MP 53-58 Paving Project 4/21/21 2pm Construct an asphalt concrete pavement (“ACP”) inlay from Kern Swamp Rd. MP 53.68 –... | 04/21/2021 | ||
| I-5 MP 85 Culvert Repair Rebid 4/20/21 3pm Culvert repair and replacement including traffic control and construction of temporary water managem... | 04/20/2021 | ||
| Enhance & Expand Parking Lot Areas 5/6/21 1:00pm Excavation of existing parking lots and regrading to accommodate ADA standards Reconfiguring traffic... | 04/19/2021 | 05/06/2021 | |
| West 13th Ave. & Dani St. Stormwater 4/22/21 2pm 563 CY General Excavation; 1 LS Clearing and Grubbing; 40 FT Drain Pipe, 6 Inch Perforated PVC w/Fil... | 04/22/2021 | ||
| Murphy Booster Pump Station 5/5/21 2pm Expand the pumping capacity of the existing Murphy Pump Station to cover a more broad flow range. N... | 05/05/2021 | ||
| UO Ponisio Lab & 3rd Floor 4/23/21 12pm Build new wall to divide 368 into two separate labs. New flooring, casework, lighting and utilities ... | 04/23/2021 | ||
| Douglas Electric Co-Op 5/4/21 2pm New construction of a 2-story 14,250 sqft office building, and adjacent 8,000 sqft Pre-Engineered Me... | 04/20/2021 | 05/04/2021 | |
| Eugene Town Square Parking Demo 4/20/21 2pm Scope includes demolition of a partial subgrade, 2 level concrete parking garage, associated utiliti... | 04/20/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.