Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Klamath Falls DHS 9/17/20 2pm
A ground-up, 91,950 SF 3-story office building. This building consists of masonry and metal cladd... |
09/17/2020 | ||
|
Thurston Rd Ph 6 Restoration 9/2/20 2pm
A.Saw cut and remove additional asphalt, cold mix asphalt, CLSMat crossings, and/oraggregate mate... |
08/31/2020 | 09/02/2020 | |
|
Pilot Butte Canal Staking Services 9/3/20 2:30pm
Define the design survey base used the Engineer in layout of the pipe system, and to set forth th... |
09/03/2020 | ||
|
Pilot Butte Canal Group 1 Precast Concrete 9/3/20 2pm
Precast Fittings. Specs noted in section V of ITB |
09/03/2020 | ||
|
Technology Services Office Remodel 9/24/20 2pm
The Project consists of the general construction services for the remodel of approximately 14,900... |
09/10/2020 | 09/24/2020 | |
|
Klamath Crimson Rose Classroom 9/30/20 2pm
This project consists of building out and existing unfinished space inside the Klamath County Juv... |
09/11/2020 | 09/30/2020 | |
|
Erickson Dental Remodel & Addition 9/18/20 2pm
2,355 sf remodel and 908 sf expansion of an existing single story, wood framed dental clinic. Sco... |
09/18/2020 | ||
|
CM/GC Madison School Renovation 9/21/20 2pm
The project includes building an addition to the existing building, replacement of existing modul... |
09/02/2020 | 09/21/2020 | |
|
Reservoir Cleaning & Inspection 9/22/20 3pm
This project includes cleaning, cleaning waste discharge, and inspection at twelve (12) of the Ci... |
09/22/2020 | ||
|
Key and Core Replacement 9/7/20 3:00pm
Design, purchase and installation of cores and keys to provide a secured and tracked key system f... |
09/07/2020 | ||
| Title | Site Walk Through | Deadline |