| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Willakenzie Substation Fence Installation 5/13/21 2pm Installation of a composite fence around EWEB’s Willakenzie Substation. | 05/12/2021 | ||
| ESB OR140 Lakeview Compound Fencing 5/11/21 2pm Work includes removing and replacing the existing barbwire fence with a 6 foot chain link fence incl... | 05/11/2021 | ||
| District 7 US101 Pavement Patching 5/10/21 3pm Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tack C... | 05/10/2021 | ||
| Myrtle Point Sidewalk Repairs 5/3/21 2pm Materials, equipment and labor to perform the following work, located between MP 21.5 and MP 21.8 al... | 05/03/2021 | ||
| Seismic Rehab Fire Station 4 5/13/21 4pm The seismic retrofit of Fire Station 4 includes rehabilitation to the existing lateral system compon... | 05/04/2021 | 05/13/2021 | |
| Dollar General Redding 5/10/21 4pm 10,640 SF Dollar General Plus going up in Bella Vista, CA. Trades include, but are not limited to: S... | 05/10/2021 | ||
| NE Hemlock HWY 97 to NE 9th St. 5/12/21 2pm Installation of approx. 250 LF of new 12″ Ductile Iron Waterline, new stormwater facilities, n... | 05/12/2021 | ||
| Hedrick MS Sidewalk Replace 5/18/21 2pm Furnish and install all materials and equipment pertaining to the removal and replacement of the cit... | 05/04/2021 | 05/18/2021 | |
| D & S Harley Davidson 5/13/21 1pm Architectural Trades Only | 05/13/2021 | ||
| BMF Process Control System Upgrade 5/12/21 2:30pm Biosolids Management Facility Process Control System Upgrade for the City of Eugene. | 05/12/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.