| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Cast In Place Concrete, Bridge Structure 6/29/21 2pm Cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, place... | 06/10/2021 | 06/29/2021 | |
| 3 Phase Power Install 6/1/21 5pm The installation of 3-phase power to an existing refrigeration unit at the Dept. of Natural Resource... | 06/01/2021 | ||
| Yreka Clinic Lighting Upgrades 6/3/21 5pm Deleting the program light system currently installed in the Karuk Medical/Dental clinic located at ... | 06/03/2021 | ||
| D7 North Douglas MIM Paving 5/26/21 2pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 05/26/2021 | ||
| A & E Emergency Communication Sites 6/7/21 12pm Consultant shall provide architectural/engineering services (survey /geotechnical /civil /electrical... | 06/07/2021 | ||
| Leaburg Fish Hatchery Roof Repair 5/27/21 3pm Replacing the asphalt shingle roof, gutters and downspouts on one (1) single family residence and tw... | 05/27/2021 | ||
| OR62 Culvert Replacement Rebid 6/8/21 2pm Replace an existing 36″ culvert crossing. There will be the addition of a new concrete inlet T... | 06/08/2021 | ||
| R4 Headquarters Lawn & Gravel 5/24/21 1pm Removal and disposal of existing lawn areas, 24″-30″ boulder placement with ODOT furnish... | 05/24/2021 | ||
| Redmond Muni Airport Rehab 6/17/21 1pm The project consists of the pavement rehabilitation of Taxiway ‘F’ (mill and overlay), shoulder grad... | 06/02/2021 | 06/17/2021 | |
| Lakeport Blvd. Sewer Rehab 6/10/21 2pm Construction of 8-inch and 10-inch sewer main, manholes, cold plane pavement removal, and asphaltic ... | 06/01/2021 | 06/10/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.