Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Coos Bay North Jetty Repair 3/23/21 10am
Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,0... |
03/23/2021 | ||
|
Urban Area ADA Ramp Project 4/1/21 10am
Removing and replacing existing sidewalk ramps by reconstructing approximately 2740 linear feet o... |
04/01/2021 | ||
|
BLM Loon Lake Storm & Water Tank 3/26/21 12pm
Remove existing Restroom A and install Government furnished CXT vault rest rooms. Includes: tree ... |
03/16/2021 | 03/26/2021 | |
|
Deadfront Padmounted Switchgears 4/6/21 2pm
Deadfront Padmounted Switchgear 15 KV. |
03/23/2021 | ||
|
Padmounted Transformers 4/6/21 2pm
Single phase and three phase padmounted transformers for use in EWEB’s distribution system.... |
04/06/2021 | ||
|
Florence Center Seismic & Maint. 3/31/21 2pm
Building systems analysis, seismic stabilization, deferred maintenance renovations, along with th... |
03/31/2021 | ||
|
Chetco Comm. Library Renovations 4/6/21 2pm
Interior renovations to the main library area including the lobby in the Chetco Community Public ... |
03/23/2021 | 04/06/2021 | |
|
Hemlock St. Improve Oak to Alder 3/31/21 2pm
Construct approximately 390 lineal feet of new curb and gutter along the north side of Hemlock St... |
03/31/2021 | ||
|
42nd Street Overlay 3/25/21 2pm
Grind and overlay existing asphalt roadway, construct ADA ramps, sidewalks, driveways, signage, s... |
03/15/2021 | 03/25/2021 | |
|
WWTP #1 Headworks Screen & Compactor 4/6/21 2pm
Replace the ¾-inch, single-rake screen, compactor, and associated package controls at the Coos B... |
03/19/2021 | 04/06/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.