| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Touchstone Interventional Pain Center 8/19/21 12pm Work of this Project is described as new two story medical office building with office-based physici... | 08/19/2021 | ||
| Kepel Spring Protection Phase II 8/17/21 3pm Work of the Project includes rehabilitation of piping for an existing concrete intake structure with... | 08/17/2021 | ||
| Bear Lake – Oak Ridge 8/25/21 2pm Build of a clubhouse, pool house and maintenance room that was burnt down in last summer’s fire at 3... | 08/25/2021 | ||
| Site Plan & Design Medical Complex 8/6/21 5pm The design of the future expansion plan will include the addition of an adjoining dental clinic to t... | 08/06/2021 | ||
| Jax Co. Emergency MGR Office Remodel 8/26/21 2pm Demolition includes: Ceiling, lighting, HVAC cassettes, carpet, door, etc. New items include: Walls,... | 08/12/2021 | 08/26/2021 | |
| Fall River Mills Roofing Project 8/19/21 11am Remove all elements of the existing metal roofing system, and roof insulation, and install a new, in... | 08/12/2021 | 08/19/2021 | |
| City Hall HVAC Replace Rebid 8/17/21 10am • 4.0 Trane Packaged Unit • Rooftop Adapter Curb • Dry Bulb Economizer • Smoke Detector with Samplin... | 08/17/2021 | ||
| Cascade CCU 8/11/21 2pm Cascade Community Credit Union intends to construct an approximately 5,000 SF two story addition to ... | 08/11/2021 | ||
| OR140 Klamath Falls Culvert Repair 8/5/21 11am Install CIPP liner in culverts at 12 locations on OR 140 and 1 location on Hwy 420. Provide work zon... | 08/05/2021 | ||
| Monroe Park Lighting Improvements 8/25/21 2:30pm In general, this project includes the removal and replacement of pedestrian pole lights and pole lig... | 08/04/2021 | 08/25/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.