Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Rainbow Lane Improvements 3/25/21 2pm
Pave Rainbow Lane from Jacobson Way through to Stanley Lane (approx linear 818 ft) install 120 li... |
03/25/2021 | ||
|
Jacoby Creek Underground Waterline 3/25/21 1pm
New fire domestic waterlines from Old Arcata Road to the new fire hydrant at the southeast cormer... |
03/25/2021 | ||
|
Gilkey Hall Design Services 3/23/21 2pm
Schematic Design, Design Development, Construction Documents, Permitting, Bidding, Construction A... |
03/15/2021 | 03/23/2021 | |
|
Newport Corridor Improvements Plumbing 3/25/21 2pm
Plumbing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segment, pr... |
03/25/2021 | ||
|
Newport Corridor Material Testing 3/25/21 2pm
Material Testing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-seg... |
03/25/2021 | ||
|
Canal Commons II 3/29/21 2pm
Phase 2 includes, but is not limited to: concrete framework, reinforcement, cast in place concret... |
03/29/2021 | ||
|
Beulah Park Renovation 3/31/21 2pm
Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 ... |
03/31/2021 | ||
|
Coos Bay North Jetty Repair 3/23/21 10am
Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,0... |
03/23/2021 | ||
|
Urban Area ADA Ramp Project 4/1/21 10am
Removing and replacing existing sidewalk ramps by reconstructing approximately 2740 linear feet o... |
04/01/2021 | ||
|
BLM Loon Lake Storm & Water Tank 3/26/21 12pm
Remove existing Restroom A and install Government furnished CXT vault rest rooms. Includes: tree ... |
03/16/2021 | 03/26/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.