Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
4th St. Paving & Restoration 5/5/21 2pm
Includes excavation, curb & gutter remove/replace, asphalt & tack coat. |
05/05/2021 | ||
|
Padmount Switch 25kv 5/6/21 2pm
This specification covers three phase dead-front, 25 kV air insulated padmount |
05/06/2021 | ||
|
Electrical Deficiencies Roseburg VA 5/26/21 2pm
Contract is to correct electrical deficiencies campus wide at the Roseburg VAMC. P... |
05/26/2021 | ||
|
Jewett Dr. Stormwater & Waterline 5/25/21 2pm
This project consists of creek restoration, storm drainage improvements, water distribution syste... |
05/25/2021 | ||
|
OSU Arts & Education Complex #1 5/19/21 2pm
Prepare the existing site for the future Arts and Education Complex (“AEC”) Project. Located ... |
04/30/2021 | 05/19/2021 | |
|
Willakenzie Substation Fence Installation 5/13/21 2pm
Installation of a composite fence around EWEB’s ... |
05/12/2021 | ||
|
ESB OR140 Lakeview Compound Fencing 5/11/21 2pm
Work includes removing and replacing the existing barbwire fence with a 6 foot chain link fence i... |
05/11/2021 | ||
|
District 7 US101 Pavement Patching 5/10/21 3pm
Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tac... |
05/10/2021 | ||
|
Myrtle Point Sidewalk Repairs 5/3/21 2pm
Materials, equipment and labor to perform the following work, located between MP 21.5 and MP 21.8... |
05/03/2021 | ||
|
Seismic Rehab Fire Station 4 5/13/21 4pm
The seismic retrofit of Fire Station 4 includes rehabilitation to the existing lateral system com... |
05/04/2021 | 05/13/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.