Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Klamath Co. Museum Sidewalk Replace 3/2/21 2pm
Removal of existing sidewalk and construction of new sidewalk, raised concrete planters/benches a... |
02/16/2021 | 03/02/2021 | |
|
North Eugene HS Bid Set C 3/12/21 2pm
The scope of work includes all building components (less structural steel and CMU), including but... |
03/12/2021 | ||
|
7-11 Convenience Store 3/2/21 2pm
New ground up 7-11 Convenience store. ALL SCOPES OF WORK ARE BIDDING. Please note sheet A0.2 for ... |
03/02/2021 | ||
|
I5 MP85 Culvert Repair *Cancelled*
Culvert Repair located on Interstate 5 at MP 85.95, including the following: Work Zone Traffic Co... |
02/25/2021 | ||
|
Rice Creek Bridge Replacement 3/26/21 2pm
Rice Creek Bridge is located at Milepost 1.41 on Willis Creek Rd (County Road #43), near the city... |
03/26/2021 | ||
|
Replace Bridge Hinkle Creek 3/26/21 2pm
Hinkle Creek Bridge is located at Milepost 0.04 on Hinkle Creek Rd (County Road #281), near the c... |
03/26/2021 | ||
|
2021 Spring Street Projects 3/4/21 2pm
The Project is for roadbed reconstruction, asphalt overlay, and removal of old asphalt at various... |
02/16/2021 | 03/04/2021 | |
|
NATVET TI 3/10/21 4pm
Veterinarian tenant improvement project of 6,149gsf on the first floor of an existing two story r... |
03/10/2021 | ||
|
Bridge Replacement McCullough Creek 3/26/21 2pm
The project scope includes the design and construction of a new bridge to replace the existing br... |
03/26/2021 | ||
|
Liquid Roads Ultra Project 3/3/21 2pm
Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s... |
03/03/2021 | ||
| Title | Site Walk Through | Deadline |