Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Water Replacement Project Schedule A & B 9/29/20 2pm
Schedule A Project consists of installing approximately 2,050 LF of 10-inch water main, 4,975 LF ... |
09/04/2020 | 09/29/2020 | |
Cypress Avenue Restore & Enhance 9/22/20 3pm
This project includes the installation of 2 bridges on the floodplain of the Sacramento River, so... |
09/10/2020 | 09/22/2020 | |
Fishing Pier Construction 9/16/20 2pm
Construction of a concrete, steel, and FRP fishing pier on breakwater of the Coquille River, near... |
09/04/2020 | 09/16/2020 | |
Mohawk and Olympic Overlay 9/24/20 2pm
Mill and pave Mohawk Blvd. from G St. to approximately 100 feet south of the Mohawk Blvd. and 18t... |
09/17/2020 | 09/24/2020 | |
VAMC Pharmacy Reconstruction 9/15/20 2pm
Perform major reconstruction of a pharmacy area at the VAMC located in Roseburg OR. |
09/15/2020 | ||
Water Improvements 2020 9/29/20 2pm
Installation of water main (6″ & 8″) and associated water appurtenances, new wate... |
09/10/2020 | 09/29/2020 | |
ADA Curb Ramp Project 9/29/20 3pm
Construct 18 curb ramps, replace 4 fire hydrants, and replace two storm water drain pipes with 4 ... |
09/29/2020 | ||
Loleta Community Services Compliance Project 9/29/20 3pm
The Work consists of, but is not limited to, furnishing all labor, materials, equipment, and inci... |
09/10/2020 | 09/29/2020 | |
2020 D7 North Douglas Fencing 9/10/20 3pm
Furnish equipment, labor and materials necessary to remove existing fencing and to construct new ... |
09/10/2020 | ||
Tank Cleaning & Recoating 9/17/20 2pm
Complete Preparation and Coating of all interior surfaces with a High Build Elastomeric. |
09/17/2020 | ||
Title | Site Walk Through | Deadline |