Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Hamilton Walton Transformation Project 4/15/21 2pm
Fortis Construction is seeking proposals for the University of Oregon (UO) Hamilton Walton Reside... |
03/31/2021 | 04/15/2021 | |
|
A & E Karuk Tribe Medical Clinic 4/6/21 5pm
The Contracted Design Firm will work, with Tribal employees’ input, to submit 100% |
04/06/2021 | ||
|
Water Meter Transmission Units 4/21/21 2pm
Purchase of Aclara RF 3400 Water Meter Transmission Units (MTU). The initial term of the awarded ... |
04/21/2021 | ||
|
OSU Cascades AB2 Site Infrastructure 4/12/21 2pm
|
04/12/2021 | ||
|
Steel Visitor Center Renovations 4/28/21 1pm
The work consists of the rehabilitation of the Steel Visitor Center, which is located in the Muns... |
04/28/2021 | ||
|
Design Build WTP Replace 5/24/21 3pm
Description: |
04/12/2021 | 05/24/2021 | |
|
Wayfinding Sign Designs 4/2/21 4pm
Creation of at least two different design templates for a series of wayfinding signs that incorpo... |
04/02/2021 | ||
|
Henley HS Roof Recover 4/13/21 2pm
The work contemplated consists of the following: partial recover of existing EPDM and TPO roofing... |
04/01/2021 | 04/27/2021 | |
|
CM/GC Graf Hall Renovation 4/29/21 2pm
Interior renovation to Graf Hall. |
03/30/2021 | 04/29/2021 | |
|
West St. Area School Safety Improvements 4/22/21 3pm
This project includes the construction of bicycle and pedestrian safety improvements along West S... |
04/22/2021 | ||
| Title | Site Walk Through | Deadline |