Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Padmounted Transformers 4/6/21 2pm
Single phase and three phase padmounted transformers for use in EWEB’s distribution system.... |
04/06/2021 | ||
|
Florence Center Seismic & Maint. 3/31/21 2pm
Building systems analysis, seismic stabilization, deferred maintenance renovations, along with th... |
03/31/2021 | ||
|
Chetco Comm. Library Renovations 4/6/21 2pm
Interior renovations to the main library area including the lobby in the Chetco Community Public ... |
03/23/2021 | 04/06/2021 | |
|
Hemlock St. Improve Oak to Alder 3/31/21 2pm
Construct approximately 390 lineal feet of new curb and gutter along the north side of Hemlock St... |
03/31/2021 | ||
|
42nd Street Overlay 3/25/21 2pm
Grind and overlay existing asphalt roadway, construct ADA ramps, sidewalks, driveways, signage, s... |
03/15/2021 | 03/25/2021 | |
|
WWTP #1 Headworks Screen & Compactor 4/6/21 2pm
Replace the ¾-inch, single-rake screen, compactor, and associated package controls at the Coos B... |
03/19/2021 | 04/06/2021 | |
|
Rickard Rd. Groff to US20 3/31/21 2pm
• Install and maintain temporary traffic control. |
03/31/2021 | ||
|
Sewer Maintenance Eureka Rebid 5/11/21 2pm
The Project is located in various locations throughout the City of Eureka, and is described as fo... |
04/27/2021 | 05/11/2021 | |
|
Prineville Reservoir State Park 4/6/21 2pm
Establish a Contract for Paving Improvements (including restoration of roadway and parking lots, ... |
04/06/2021 | ||
|
Harrisburg Middle School 3/30/21 2pm
Scope of work includes abatement, selective demo, concrete, masonry, structural steel & sheet... |
03/12/2021 | 03/30/2021 | |
| Title | Site Walk Through | Deadline |