Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Graham Field Offices Residing Project 6/9/21 2pm
The Project consists of exterior building envelope repairs. The Work includes selective demolitio... |
06/02/2021 | 06/09/2021 | |
|
2021 Drywell Elimination Program 6/10/21 2:30pm
The scope of work for this contract includes: – Cleaning existing stormwater system<... |
06/10/2021 | ||
|
Amazon Prarie Mitigation Bank 6/15/21 1pm
The scope of work for this contract includes: – Preservation and protection of exist... |
06/15/2021 | ||
|
COID Pilot Butte Small Diameter Pipe 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
COID Pilot Butte Canal Precast Concrete 7/1/21 2:00pm
Piping currently open irrigations canals in multiple segments. This includes piping of the mainli... |
07/01/2021 | ||
|
E 40th Ave Storage Tank Tree Remove 6/10/21 2pm
The project will require the removal and disposal of approximately 265 trees, installation of 1,7... |
06/02/2021 | 06/10/2021 | |
|
Platt Ave Curb Gutter Paving 6/15/21 11am
Curb and Gutter, Paving, Grading |
06/15/2021 | ||
|
ERD Parcel 3BC MEP Design Build 6/14/21 2pm
The project is four-story apartment building that is “C” shaped in plan with an area of appro... |
06/14/2021 | ||
|
Southwest Airlines Offices 6/8/21 2:30pm
Tenant improvements at ground and upper floors of the A Gates area and minor work at the baggage ... |
06/01/2021 | 06/08/2021 | |
|
Wilson Corridor Improvement Project 6/23/21 3pm
Modernizing Wilson Avenue from Douglas Street to 15th Street. The intersections of 9th Street and... |
06/08/2021 | 06/23/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.