| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Hollow Lane Storm Drain Project 1/6/22 3pm Replace double corrugated metal storm drain pipes with a precast reinforced concrete box culvert to ... | 01/06/2022 | ||
| Resurface Basketball Court 1/11/22 2pm Resurface and stripe the existing Enterprise Park Basketball Courts (approximately 11,500 S.F.) | 01/11/2022 | ||
| Walk in Cooler JoLane Middle School 1/13/22 2pm Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement unit s... | 01/13/2022 | ||
| Walk in Cooler Fremont Middle School 1/13/22 2pm Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement unit s... | 01/13/2022 | ||
| Walk in Cooler Fullerton Elem 1/13/22 2pm Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement unit s... | 01/13/2022 | ||
| Walk in Cooler Eastwood Elementary 1/13/22 2pm Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement unit s... | 01/13/2022 | ||
| Walk in Cooler Roseburg PS Warehouse 1/13/22 2pm Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement unit s... | 01/13/2022 | ||
| I-5 Tree Removal & Brushing MP10-11 12/9/21 2pm Tree removal and brushing located along the North side of I-5, between MP 10 just South of Neil cree... | 12/09/2021 | ||
| Pacificsource TI Level 2 12/15/21 12pm The Tenant Improvements include approximately 14,867 SF of space on the second floor of the PacificS... | 11/19/2021 | 12/15/2021 | |
| Klamath, Lake, Deschutes Co. Curb Ramps 1/27/22 9am The Work to be done under this Contract consists of the following: 1. Install and remove temporary t... | 01/27/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.