| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Wastewater Treatment Improvement 1/25/22 2pm
Constructing a new secondary clarifier, replacing sludge lagoon HDPE liner, oxidation ditch aerat... |
12/07/2021 | 01/25/2022 | |
|
Collection System Improvements Phase 2 1/27/22 2pm
Replacement of mechanical, electrical, and controls at the Main and Bartel Lift Stations, as well... |
12/07/2021 | 01/27/2022 | |
|
Curb Ramps Various 12/2/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
12/02/2021 | ||
|
I-5 Emergency Fence Repair 12-2-21 9am
Remove existing and install new fence in the area specified. |
12/02/2021 | ||
|
Crater & Scenic MEP Renovations 12/9/21 2pm
S+B James Construction Management solicits proposals from Design Assist Subcontractors interested... |
11/18/2021 | 12/09/2021 | |
|
Brushing Highway 238 MP30-31 11/23/21 3pm
Clearing and brushing vegetation to improve roadway site distance. Includes clearing, trimming an... |
11/23/2021 | ||
|
Monroe & Spencer Butte MS Roof 12/14/21 2pm
New roofing at Monroe and Spencer Butte Middle Schools. |
11/17/2021 | 12/14/2021 | |
|
Bunkhouse at Cross Keys Hotel 11/23/21 4pm
This hotel will be 3 stories tall and 29,121 SF with 50 rooms. The hotel will be wood framed with... |
11/23/2021 | ||
|
Empire & Eastside Boat Ramp Float Re-Bid 1/25/22 2pm
The project is for the fabrication and delivery of fourteen (14) aluminum boat ramp floats, as pe... |
01/25/2022 | ||
|
Highway 126 Sidewalks 12/8/21 2pm
Installation of approx. 13,000 SF of new concrete flatwork including sidewalk, driveways, and oth... |
12/08/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.