Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Normil Terrace Waterline Extension 7/12/21 2pm
Construction of 8” waterline at Normil Terrace in Medford. This work consists of, but is not li... |
07/12/2021 | ||
|
Old CP Force Main Replace 7/13/21 2:15pm
The construction of 1,116 feet of 8 inch and 1,373 feet of 10 inch sanitary sewer pipe along with... |
07/13/2021 | ||
|
Grove Phase 2 7/14/21 2pm
Construction of a 34,176SF three story multi-family residential building. The building has tuck-u... |
07/14/2021 | ||
|
Sutherlin SD Residing 7/16/21 2pm
Residing of East Primary School 9 1/4 plank w/ 8″ exposure installed Install ... |
07/16/2021 | ||
|
A & E Medical Complex 7/14/21 5pm
The property, selected by Tribal staff for this project, will need to be surveyed to determine tr... |
07/14/2021 | ||
|
US101 Big Creek Bridge 7/22/21 9am
1. Construct Replica Historic Bridge Railing. |
07/22/2021 | ||
|
City of Bend Signal Upgrades 7/15/21 9am
1. Install traffic signal modifications at nine different locations within the city of Bend. | 07/15/2021 | ||
|
OR36 Indian Creek Bridge 7/15/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
07/15/2021 | ||
|
Fowlers Campground Tree Removal 7/20/21 10am
The Shasta-McCloud Management Unit is requesting a logging company or tree service to remove 170 ... |
07/20/2021 | ||
|
Madrona #2 Sewer & Pavement 7/20/21 2pm
Removal and preparation of street, prepare and pave back 750 tons of Level 2 HMAC, replacement of... |
07/09/2021 | 07/20/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.