| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| KCC Fire Tower Training Structure 1/11/22 2pm Design a Fire Tower training system that will work with drawings and specification for the project p... | 01/11/2022 | ||
| McCornack ES Asbestos Flooring 1/13/22 2pm Removal of non-asbestos containing floor tile, and asbestos containing floor tile mastic and cove ba... | 12/30/2021 | 01/13/2022 | |
| Sheldon HS Asbestos Flooring 1/13/22 2pm Work is described as the removal of asbestos containing floor tile, floor tile mastic and cove base ... | 12/30/2021 | 01/13/2022 | |
| Group 1 Pump Station 2/1/22 2pm Demolition and reconstruction of two irrigation pump stations. • The existing Barnes Butte Pumping P... | 01/06/2022 | 02/01/2022 | |
| Camas Ridge ES Asbestos Abatement 1/13/22 2pm Removal and disposal of asbestos containing wall and flooring material at Camas Ridge Elementary Sch... | 12/30/2021 | 01/13/2022 | |
| Siskiyou Crossroads 1/21/22 2pm This project is being developed by RCHDC (Rural Community Housing Development Corporation). The proj... | 01/21/2022 | ||
| Generator Install Yreka Clinic 12/31/21 5pm Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic located a... | 12/31/2021 | ||
| Harbor Freight Tools TI 1/7/22 Exterior and interior alterations of a former JC Penny Department Store. Interior alterations inclu... | 01/07/2022 | ||
| Flanigan Pole Replacements 1/27/22 2pm Work tasks on this project generally include the replacement of 10 existing wood pole 115 kV H-frame... | 01/11/2022 | 01/27/2022 | |
| Settling Basin Phase 1 1/20/22 2pm This project consists, in general, of: Removal and disposal of lead base painted mechanical equipmen... | 01/04/2022 | 01/20/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.