Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Highway 97 Fencing MP 179-183 7/22/21 11am
Work includes installing wildlife fencing on the East and West sides of Hwy 97 between MP 179.97 ... |
07/22/2021 | ||
|
Willamette SSFP Improvements 8/5/21 2pm
Excavation for & construction of cast-in-place concrete curb wall, as indicated in drawings. ... |
07/07/2021 | 08/05/2021 | |
|
RCU Steel & Metal Building 7/13/21 5pm
New Construction of a single story pre-engineered metal building and storage build-outs for the &... |
07/13/2021 | ||
|
Brussells St. Pavement Replace 7/21/21 2pm
Remove approximately 5000 SY of existing asphaltic concrete surface and pave back 900 tons of Lev... |
07/13/2021 | 07/21/2021 | |
|
New Jet-A Fueling System Rebid 8/17/21 2pm
Fabricate and install NEW JET-A AIRCRAFT FUELING SYSTEM EQUIPMENT at the Grants Pass Airport. Maj... |
08/17/2021 | ||
|
Half Moon Bay Shop Building 7/27/21 2pm
Construction of a shop building 30 feet by 62 feet per engineered drawings |
07/27/2021 | ||
|
US97/US20 Bend N Corridor Design Build 8/18/21 9am
This re-evaluation assesses the effect of environmental statutes, regulations, policies and guida... |
08/18/2021 | ||
|
Stillwater Business Park Lighting 7/15/21 3pm
Install seven street lights along the south side of Venture Parkway from Old Oregon Trail to Stil... |
07/15/2021 | ||
|
Carr Fire Buenaventura Bridges 7/30/21 3pm
Install nine pedestrian bridges along the Buenaventura Trail that were burned during the 2018 Red... |
07/30/2021 | ||
|
Single Phase Distribution Transformers 7/19/21 3pm
SINGLE-PHASE, PAD-TYPE DISTRIBUTION TRANSFORMERS 12kV-240/120V, Single Phase |
07/19/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.