Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Shasta Middle School Classroom Reno 6/29/21 3pm
2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including int... |
06/18/2021 | 06/29/2021 | |
|
Tulelake Parking Lot Gravel 6/25/21 5pm
Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance... |
06/25/2021 | ||
|
South Gate Bridge Project 7/22/21 1pm
Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voide... |
07/22/2021 | ||
|
McDonald’s Klamath Falls 6/21/21 12pm
Sitework, paving, seal coating, striping, landscape/irrigation, interio... |
06/21/2021 | ||
|
Windsor Estates Speed Table 7/15/21 2pm
Installation of four (4) HMA speed tables and associated striping and signage assemblies. All oth... |
07/15/2021 | ||
|
Citywide Safety 3rd & Pinebrook 7/15/21 2pm
Construction of accessible curb ramps, sidewalk, modular block wall, a raised concrete median saf... |
07/15/2021 | ||
|
SE Anton Center 6/25/21 4pm
Sub bids needed for excavation, slab prep, unterground utilities, stormwater detention system, si... |
06/25/2021 | ||
|
Burrill’s 7th St. Station 7/6/21 2pm
Main structures consist of two pre-engineered metal buildings each 10,000 GSF of office, warehous... |
07/06/2021 | ||
|
2021 Main St. Stevens Road Driveways 6/16/21 10am
Traffic control, concrete driveway, concrete removal, minor grading. |
06/16/2021 | ||
|
Warehouse Add & Office Renovations 8/17/21 2pm
The scope consists of site demolition, office space renovation, demolition of an existing warehou... |
06/15/2021 | 08/17/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.