Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Oregon War Heroes Memorial Landscape 8/5/21 2pm
This project consists of landscaping, irrigation, and electrical lighting installation. This is a... |
08/05/2021 | ||
|
The Village School HVAC Gym & Office 6/28/21 6pm
The kitchen and cafeteria currently are connected to a lega... |
06/28/2021 | ||
|
The Village School HVAC Kitchen & Cafeteria 6/28/21 6pm
The kitchen and cafeteria currently are connected to a lega... |
06/28/2021 | ||
|
The Ewing Building 7/22/21 2pm
The project is the new construction of a 7,524 SF pre-engineered metal building (PEMB) structure ... |
07/22/2021 | ||
|
Soil Stabilization Mercer Lake Rd. 6/29/21 1pm
The approximate length of roadway to have the adjacent slopes stabilized by preapproved methods o... |
06/29/2021 | ||
|
Shasta Middle School Classroom Reno 6/29/21 3pm
2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including int... |
06/18/2021 | 06/29/2021 | |
|
Tulelake Parking Lot Gravel 6/25/21 5pm
Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance... |
06/25/2021 | ||
|
South Gate Bridge Project 7/22/21 1pm
Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voide... |
07/22/2021 | ||
|
McDonald’s Klamath Falls 6/21/21 12pm
Sitework, paving, seal coating, striping, landscape/irrigation, interio... |
06/21/2021 | ||
|
Windsor Estates Speed Table 7/15/21 2pm
Installation of four (4) HMA speed tables and associated striping and signage assemblies. All oth... |
07/15/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.