Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Stillwater WTP Filter Underdrain Replace 9/9/21 3pm
Rehabilitation of one 16 foot wide by 65 foot long automatic backwash filter mechanisms, and filt... |
08/31/2021 | 09/09/2021 | |
|
Seeds, Seedlings & Erosion Control 8/24/21 2pm
The Eugene Water & Electric Board (EWEB) requests bids from contractors interested in providi... |
08/24/2021 | ||
|
Pioneer Hall AC Replacement 9/14/21 4pm
Remove & Replace AC System |
08/18/2021 | 09/14/2021 | |
|
City Council Chambers 8/26/21 2pm
Construction of a wooden dais, ramp, 2 tread stairs, interior wall partitions, cabinetry, and ele... |
08/19/2021 | 08/26/2021 | |
|
Klamath Falls Pavement Rehab 9/9/21 1pm
Pavement Maintenance & Rehabilitation |
09/09/2021 | ||
|
Paving Restoration Pilot Butte 8/31/21 2pm
Paving Restoration including removing overburden materials; asphalt milling and removal; base gra... |
08/31/2021 | ||
|
Canby & East St. Watermain Replace 8/26/21 2pm
Construction of 8 inch potable waterline, tunneling/boring and jacking, construction of potable w... |
08/26/2021 | ||
|
Marshfield HS Stadium Reroof & Video 8/19/21 2:15pm
Removal and replacement of the existing built-up roof system on the MHS North Stadium Building. W... |
08/12/2021 | 08/19/2021 | |
|
OR126 Pedestrian Improvements 8/17/21 2pm
ODOT is seeking one qualified contractor to install pedestrian safety improvements on OR126B in S... |
08/17/2021 | ||
|
Repair of Tower Simulator System Exterior 9/7/21 10am
This project involves removal and disposal (approximately 7600 SF) of existing 4 ft. wide panel s... |
08/24/2021 | 09/07/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.