Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Building 127 Kingsley Field 9/23/21 11am
Building 127 addition proposes a Pre-Engineered Metal Building (PEMB) to |
09/23/2021 | ||
|
Chemical Injection Sprayer 10/14/21 2pm
Purchase of one (1) chemical injection sprayer. |
10/14/2021 | ||
|
Pithvuyram Center Remodel 9/27/21 4pm
THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, |
09/27/2021 | ||
|
RCC Ceramics Building Redwood Campus 10/11/21 2pm
Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceram... |
09/28/2021 | 10/11/2021 | |
|
California Alley Utility Improve 10/14/21 3pm
Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street... |
10/14/2021 | ||
|
Design Build Winston Dillard SD Offices 11/4/21 2pm
The building must have twelve (12) offices as detailed: |
11/04/2021 | ||
|
Evergreen Family Medicine Office 10/7/21 4pm
Adroit Construction Company is seeking subcontractor bids for work including but |
10/07/2021 | ||
|
Peoples Irrigation Pipe Install 10/5/21 2pm
Mobilize, perform selective demolition, install a furnished approximate 1,893 LF of 48-inch diame... |
09/23/2021 | 10/05/2021 | |
|
Water Quality Improvements Project 10/19/21 2pm
Construct a new chemical storage and dosing building at the Robert A. Duff Water Treatment Plant ... |
10/19/2021 | ||
|
Solid Waste Beaver Hill Fence Project 10/5/21 2pm
Install new 7-foot chain link fence including all hardware, post, rails, and braces with new thre... |
09/16/2021 | 10/05/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.