| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 2022 Multisite Wood Floor Refinishing 2/24/22 2pm Screen and recoat of 12 wood floors at 8 sites. Also the sanding and finishing of one classroom. | 02/24/2022 | ||
| 2022 Guardrail Improvements 2/23/22 2pm Install and maintain temporary traffic control. Install guardrail and appurtenant elements. The valu... | 02/23/2022 | ||
| Renaissance Flats Apts. 2/24/22 2pm 72 Unit Apartment Complex and Clubhouse approximately 69,048 SF. Adroit Construction Company is seek... | 02/24/2022 | ||
| SOU Conceptual Design Indigenous Garden 3/31/22 4pm This RFQ seeks information that will supplement SOU’s exploration of a conceptual design for an Indi... | 03/05/2022 | 03/31/2022 | |
| Bridge Deck Overlay 3/1/22 10am The approximate quantities are: 54 square yards Class 2 Preparation (Big Fall Creek Rd.), 480 square... | 03/01/2022 | ||
| 2022 Roadway Repairs 2/22/22 2pm This project consists of removal of existing ramps, curbs, and gutters, pavement removal, grinding/i... | 02/22/2022 | ||
| Multisite Painting 2022 2/24/22 2pm Preparing and painting the entire exterior of the school, along with application of water repellant ... | 02/10/2022 | 02/24/2022 | |
| 2022 Seal Coat Liquid Roads Ultra 3/11/22 1pm The 2022 Seal Coat “Liquid Roads Ultra” Project will consist of approximately 342,000 Sq... | 03/11/2022 | ||
| UO Baker Center Roof Replace Ph2 Area F 3/1/22 2pm Removal of existing roof assemblies and installation of new roofing assemblies and flashing with ass... | 02/08/2022 | 03/01/2022 | |
| Runway 16-34 Seal Coat & Guidance Sign 3/3/22 2pm The Project generally consists of minor crack repair, wide crack repair, pavement marking removal, p... | 02/14/2022 | 03/03/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.