| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Westholm Park Playground Drainage 5/5/22 3pm Installing 708 linear feet of storm drain pipe, 13 cleanouts, 40 square feet of concrete sidewalks, ... | 04/28/2022 | 05/05/2022 | |
| OR138 & OR234 Bridges 5/12/22 9am 1. Install temporary traffic control. 2. Perform bridge rehabilitation work. 3. Install Asphalt conc... | 05/12/2022 | ||
| System Upgrade at Former Steam Plant 5/6/22 4pm Designing and implementing a security system at the former Steam Plant in downtown Eugene. | 05/06/2022 | ||
| Airfield Electrical Lighting Materials 5/11/22 2pm Project consists of material purchases required to replace lighting associated with Runway 14-32 and... | 05/03/2022 | 05/11/2022 | |
| Hugh Hartman Mechanical Upgrade Rebid 6/1/22 2pm The scope of work will consist of disconnect and removal of two existing gas cast iron boilers with ... | 05/20/2022 | 06/01/2022 | |
| Heritage Renovation Project 5/10/22 2pm The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, by e... | 04/28/2022 | 05/10/2022 | |
| South 28th Sewer Extension 5/11/22 2pm This project consists of the extension of an existing gravity wastewater pipeline along S 28th Stree... | 04/26/2022 | 05/11/2022 | |
| Provision of Electrical Components 5/5/22 2:30pm Providing switch gear, transformer, and related electrical products. This ITB does not include insta... | 04/28/2022 | 05/05/2022 | |
| Slurry Seal Winchester Bay 5/4/22 8:30am Implement temporary traffic control, perform crack sealing, construct emulsified asphalt slurry seal... | 05/04/2022 | ||
| Crow Middle/HS Locker Room Refurbish 4/27/22 3:30pm The work consists of ceramic tile repair and replacement, ceiling tile replacement, rubber base, int... | 04/19/2022 | 04/27/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.