| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 421 W 10th Remodel 4/5/22 5pm The project scope includes site work to prep for: Addition of shower stall to existing 2 piece bathr... | 04/01/2022 | 04/05/2022 | |
| Upper West Branch Bridge 4/26/22 1pm The purpose of this project is to fully replace the Upper West Branch Creek Bridge on Forest Route 1... | 04/26/2022 | ||
| Territorial Hwy Improve Kruger to Fir 4/28/22 3pm Designing and preparing construction drawings and specifications for pavement preservation improveme... | 04/28/2022 | ||
| Silva Theatre Sound System 5/3/22 2:30pm Provision of a sound system for the Silva Theater at the Hult Center for the Performing Arts. The sy... | 05/03/2022 | ||
| Klamath Falls Sonic Project 4/14/22 4pm Trades involved include but are not limited to; Site/Civil, Landscaping, Underground Utilities, Site... | 04/14/2022 | ||
| East Science MV Electrical Loop 4/12/22 3pm Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV cabl... | 03/29/2022 | 04/12/2022 | |
| OR542 Curb Ramps Project 4/14/22 9am 1. Install temporary traffic control devices and pedestrian routing. 2. Construct ADA curb ramps at ... | 04/14/2022 | ||
| Margaret Keating ES Reroof 4/27/22 1pm Removal of existing built-up asphalt roofing, gutters & downspouts. New single ply roofing over ... | 04/13/2022 | 04/27/2022 | |
| Holly Theatre 4/29/22 2pm Renovations & Restoration of Historic Theatre. Trades include but not limited to: demolition, li... | 04/29/2022 | ||
| Harrison Ave. Pavement Maintenance 4/12/22 2pm Work to be performed includes, but not limited to, grinding and paving, construction and replacement... | 04/12/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.