| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| SCADA Upgrade Improvements 5/5/22 2pm Process monitoring, control, and historical tracking take place through the existing SCADA system. M... | 04/21/2022 | 05/05/2022 | |
| RFQ Engineering Muni Water System 5/19/22 4pm The City of Grants Pass desires to select an engineering firm to enter into a renewable five-year Ma... | 05/19/2022 | ||
| Everett & State Roadway Improvements 4/27/22 2pm Removal and reconstruction of curb, gutter, sidewalk, and asphalt pavement on Everett Avenue between... | 04/27/2022 | ||
| Sunset School Security Vestibule 5/5/22 2pm Construction of a new security vestibule inside the main lobby of Sunset School, as well as select r... | 04/19/2022 | 05/05/2022 | |
| Eagsa Monitoring Well 5/5/22 3pm The project includes drilling, logging, construction, development, and sampling of one triple-nested... | 05/05/2022 | ||
| Multi Modal Transportation Hub 4/28/22 3pm The City of Sisters seek proposals from qualified transportation consulting firms with experience i... | 04/28/2022 | ||
| Zogg Fire Road Resurfacing 4/21/22 11am The work, in general, consists of replacing existing culverts, removing existing pipe culvert headwa... | 04/21/2022 | ||
| Donor Bench & Levy Furniture Install 5/12/22 2:30pm Installation of park benches and levy furniture at sites throughout the Eugene Parks and Open Space ... | 05/12/2022 | ||
| Tom McCall ES/Elton Gregory MS Add 4/27/22 4pm Construction of a new 10,000 square foot addition in between Tom McCall Elementary School and Elton ... | 04/14/2022 | 04/27/2022 | |
| Cave Junction ADA Ramp Improve 4/28/22 2pm Construct ADA ramps, asphalt street repair and pavement striping at five (5) different sites through... | 04/19/2022 | 04/28/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.