| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Territorial Hwy Improve Kruger to Fir 4/28/22 3pm Designing and preparing construction drawings and specifications for pavement preservation improveme... | 04/28/2022 | ||
| Silva Theatre Sound System 5/3/22 2:30pm Provision of a sound system for the Silva Theater at the Hult Center for the Performing Arts. The sy... | 05/03/2022 | ||
| Klamath Falls Sonic Project 4/14/22 4pm Trades involved include but are not limited to; Site/Civil, Landscaping, Underground Utilities, Site... | 04/14/2022 | ||
| East Science MV Electrical Loop 4/12/22 3pm Purchase and installation of three (3) pad mount medium voltage dielectric switches, provide MV cabl... | 03/29/2022 | 04/12/2022 | |
| OR542 Curb Ramps Project 4/14/22 9am 1. Install temporary traffic control devices and pedestrian routing. 2. Construct ADA curb ramps at ... | 04/14/2022 | ||
| Margaret Keating ES Reroof 4/27/22 1pm Removal of existing built-up asphalt roofing, gutters & downspouts. New single ply roofing over ... | 04/13/2022 | 04/27/2022 | |
| Holly Theatre 4/29/22 2pm Renovations & Restoration of Historic Theatre. Trades include but not limited to: demolition, li... | 04/29/2022 | ||
| Harrison Ave. Pavement Maintenance 4/12/22 2pm Work to be performed includes, but not limited to, grinding and paving, construction and replacement... | 04/12/2022 | ||
| SOU Beach Volleyball Courts 4/21/22 3pm The work scope includes, but is not limited to: • Chain link fence removal and replacement • Saw cut... | 04/11/2022 | 04/21/2022 | |
| Vern Patrick Elementary Addition 4/13/22 4pm Construction of a new 10,700 square foot addition connected to Vern Patrick Elementary and renovatio... | 03/30/2022 | 04/13/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.