Title | Site Walk Through | Deadline | |
---|---|---|---|
Student Health Center Building Add 6/15/21 1pm
The project consists of an 1800 SF single story addition to the existing student health center wh... |
05/25/2021 | 06/15/2021 | |
Berkeley Park Renovation 6/3/21 2pm
The scope of work for this contract includes: |
06/03/2021 | ||
WTP Emergency Backup Generator 7/20/21 5pm
Purchase & install an emergency backup 30kw propane generator system to operate the water tre... |
07/20/2021 | ||
Irvington Pump Station Transfer Switch 6/15/21 2:30pm
Removal of existing switch gear and installation of new 480-volt, 3 phase, 1000 ampere switch gea... |
05/27/2021 | 06/15/2021 | |
D7 SB Canyon Mountain MIM Paving 5/26/21 3pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
05/26/2021 | ||
Stewart Parkway Pavement Rehab 6/2/21 2pm
Pavement rehabilitation, including grinding, paving, and striping. |
06/02/2021 | ||
Ridge Rd. Watermain Extension 6/3/21 3pm
EXTENDING APPROXIMATELY 164 LINEAL FEET OF 8″ |
05/27/2021 | 06/03/2021 | |
Arrowsmith, Bailey Hill, Roosevelt, Terry Paving 6/2/21 2pm
The scope of work for this contract includes: – Cold plane removal of existing aspha... |
06/02/2021 | ||
MSDEC Remodel Early Work Package 6/15/21 2pm
Selective Demolition and Hazmat Abatement, structural steel framing, rough carpentry, wood casewo... |
06/02/2021 | 06/15/2021 | |
Building 84 Shell Only 5/28/21 4pm
Shell only construction of a 10,350 sf commercial building including concrete, electrical, HVAC, ... |
05/28/2021 | ||