Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Half Moon Bay Shop Building 7/27/21 2pm
Construction of a shop building 30 feet by 62 feet per engineered drawings |
07/27/2021 | ||
|
US97/US20 Bend N Corridor Design Build 8/18/21 9am
This re-evaluation assesses the effect of environmental statutes, regulations, policies and guida... |
08/18/2021 | ||
|
Stillwater Business Park Lighting 7/15/21 3pm
Install seven street lights along the south side of Venture Parkway from Old Oregon Trail to Stil... |
07/15/2021 | ||
|
Carr Fire Buenaventura Bridges 7/30/21 3pm
Install nine pedestrian bridges along the Buenaventura Trail that were burned during the 2018 Red... |
07/30/2021 | ||
|
Single Phase Distribution Transformers 7/19/21 3pm
SINGLE-PHASE, PAD-TYPE DISTRIBUTION TRANSFORMERS 12kV-240/120V, Single Phase |
07/19/2021 | ||
|
Big Butte Springs Watershed Logging 7/27/21 2pm
Commercial thinning will be focused on an area approximately 180 acres in size, east of and immed... |
07/27/2021 | ||
|
Remove & Replace HVAC Lava Beds 7/28/21 2pm
The National Park Service, Lava Beds National Monument, has the requirement for the removal of ex... |
07/28/2021 | ||
|
Fairchild Medical Lobby Remodel 9/29/21 12pm
Project consists of partial demolition of an existing administration space, lobby, partial corrid... |
09/29/2021 | ||
|
Campus Dr. Dan O’Brien Roundabout 8/3/21 1pm
Construction of a roundabout at the intersection of Campus Drive and Dan O’Brien Way. Work incl... |
07/01/2021 | 08/03/2021 | |
|
RFQ Engineering Svcs. Wastewater System 8/5/21 4pm
The City of Grants Pass desires to select an engineering firm to enter into a five-year Master Se... |
07/14/2021 | 08/05/2021 | |
| Title | Site Walk Through | Deadline |