| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
COCC Chandler Chiller Replace 10/6/21 4pm
Remove existing chilled water system and replace with updated specifications. |
09/15/2021 | 10/06/2021 | |
|
Reser Stadium BP#4 Steel & Fire Supp 10/6/21 2pm
Project is part of the new Westside Stadium, including new outdoor stadium seating areas, concou... |
09/14/2021 | 10/06/2021 | |
|
EAC & Base Rock Production 10/19/21 10am
• Produce and stockpile 3/8”- # 4 chip rock in various designated stockpile locations. |
10/19/2021 | ||
|
Lane Co. Navigation Center Early Demo **Cancelled***
The Project consists of general construction services for the selective interior demolition of an... |
09/09/2021 | 09/22/2021 | |
|
Substation Foundation & Conduits 9/28/21 2pm
Remove existing fencing, switchgear foundation, conduits and vaults and to install equipment foun... |
09/14/2021 | 09/28/2021 | |
|
RFQ SW Oregon Regional Airport 10/15/21 2pm
Submit statements of qualification for various as-needed professional services for development of... |
10/15/2021 | ||
|
Water Quality Chemicals 10/12/21 3pm
WWTP 1 is located near downtown Coos Bay at 680 Ivy Ave. The plant currently uses two chemicals. ... |
10/12/2021 | ||
|
Creative Arts Building College of Redwoods 9/29/21 5pm
In general, the scopes of work for this project consists of, but not limited to: |
09/29/2021 | ||
|
Water Treatment Plant Standby Generator 9/30/21 2pm
Installation of permanent standby diesel generators at the City’s Water Treatment Plant and Res... |
09/16/2021 | 09/30/2021 | |
|
US97 Redmond Bend Project 9/23/21 9am
1. Construct a deceleration lane on US97 at SW Quarry Ave . |
09/23/2021 | ||