Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Conduit Install Directional Bore 12/20/21 2pm
A bore of one (1) two-inch (2”) conduit installed per SUB specifications. Starting from vault 7... |
12/03/2021 | 12/20/2021 | |
|
Clelland Shop Addition 12/23/21 5pm
Shop addition & remodel. Also adding ADU within the new footprint. Existing 700 sq ft wood fr... |
12/23/2021 | ||
|
Weed Elementary Metal Roof & Wall Panels 12/7/21 2pm
Metal roof and wall panels for Weed Elementary School Cafeteria |
11/30/2021 | 12/07/2021 | |
|
College Hill HS Renovation 12/21/21 2pm
The project includes seismic, mechanical, and electrical upgrades, as well as renovations to exis... |
11/30/2021 | 12/21/2021 | |
|
2022 Wastewater Collection & Storm Drain 12/7/21 2pm
Install 96 pipe sections with cured in place pipe liner within the city of Medford. Estimated cos... |
12/07/2021 | ||
|
Mills & Pelican Schools Roof Repair 12/16/21 2pm
Generally, the work consists of reroofing 43,642 square feet of roof with TPO mechanically fasten... |
12/07/2021 | 12/16/2021 | |
|
RFP Hazardous Fuel Treatment 12/20/21 3pm
The purpose of this solicitation is to create a pool of contractors qualified to treat and remove... |
12/20/2021 | ||
|
RCC Health Professions Building K Remodel 12/15/21 2pm
The Project includes but is not limited to the following: Water, sewer, gas, and electrical impro... |
11/30/2021 | 12/15/2021 | |
|
Brixner Jr. High School Seismic Retrofit 12/9/21 4pm
In general, the Brixner Junior High School project may include the following components: T... |
11/23/2021 | 12/09/2021 | |
|
US97 and US20 Bend North Corridor 3/15/22 9am
The Project includes the design and construction of the transportation improvements identified be... |
11/29/2021 | 03/15/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.