Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
A & E Admin/Ops Building Upgrades 4/14/21 3pm
The purpose of this document is to provide interested parties with information to enable |
04/14/2021 | ||
Roadway Striping Rumble Strip Install 3/30/21 10am
The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement m... |
03/30/2021 | ||
Oil Rock, Sanding Rock Various Sites 3/23/21 10am
The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” ... |
03/23/2021 | ||
Elkton Elementary Phase II 4/1/21 3pm
Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is ... |
04/01/2021 | ||
GP Oil Stop & Car Wash 3/17/21 2pm
Ground up construction of car wash and oil stop. Specs are included with the plans. |
03/17/2021 | ||
Chemult Maintenance Shop Asbestos 3/24/21 11am
Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or a... |
03/24/2021 | ||
Windsor Cir. 36th & 38th Pavement 3/19/21 2pm
Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay... |
03/19/2021 | ||
Half Moon Bay Shop Flatwork 3/30/21 2pm
Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prep... |
03/12/2021 | 03/30/2021 | |
Tank 1 & Roseburg Water System Project 5/4/21 2pm
The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welde... |
03/15/2021 | 05/04/2021 | |
Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm
Replace existing hydronic boiler with new energy efficient |
03/15/2021 | 03/30/2021 | |
Title | Site Walk Through | Deadline |