| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Slide In Water Tank 3/30/22 2:30pm
A 3000 gallon steel tank that can be inserted and removed from a DT-14 dump truck. The tank will ... |
03/30/2022 | ||
|
Upper Doolittle & Mill Creek Bridges 4/7/22 1pm
The Klamath National Forest (KNF) sustained significant damage to transportation facilities, incl... |
04/07/2022 | ||
|
Radio Read Meter Replace Rebid 4/26/22 2pm
Replace 601 water meters with new radio read meters. An antenna and base station above ground wil... |
04/14/2022 | 04/26/2022 | |
|
Drinking Water Distribution System 3/31/22 2pm
The work consists of replacing 6,110 lineal feet of 8” DR-18 PVC, 3,560 lineal feet of 6” DR-... |
03/31/2022 | ||
|
Whyte TF Grandstand CMGC 4/5/22 2pm
OSU is seeking proposals from general contractors to act as Construction Manager/General Contract... |
03/18/2022 | 04/05/2022 | |
|
Lasells Stewart Ctr Mech & Roof 3/30/22 2pm
The work consists of new fall protection, selective demolition, electrical, roofing/insulation | |||
|
Remove, Dispose Recycle Hazardous Waste 3/28/22 2pm
Successful Contractor shall furnish all labor, materials, tools and equipment to remove, recycle ... |
03/28/2022 | ||
|
Vinyl Strip Shop Doors 3/22/22 2pm
Work includes all materials, labor and equipment to install vinyl strip doors at existing overhea... |
03/22/2022 | ||
|
CM/GC Fleming Middle School 4/5/22 2pm
The project consists of comprehensive seismic improvement of administration, library, gym, and ca... |
03/17/2022 | 04/05/2022 | |
|
McKenzie SD Grandstands & Remaining Work 3/23/22 2pm
The project consists of the seismic upgrades required at existing gym / administrative areas, inc... |
03/23/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.