Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
OSU Arts & Education Complex #1 5/19/21 2pm
Prepare the existing site for the future Arts and Education Complex (“AEC”) Project. Located ... |
04/30/2021 | 05/19/2021 | |
Willakenzie Substation Fence Installation 5/13/21 2pm
Installation of a composite fence around EWEB’s ... |
05/12/2021 | ||
ESB OR140 Lakeview Compound Fencing 5/11/21 2pm
Work includes removing and replacing the existing barbwire fence with a 6 foot chain link fence i... |
05/11/2021 | ||
District 7 US101 Pavement Patching 5/10/21 3pm
Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tac... |
05/10/2021 | ||
Myrtle Point Sidewalk Repairs 5/3/21 2pm
Materials, equipment and labor to perform the following work, located between MP 21.5 and MP 21.8... |
05/03/2021 | ||
Seismic Rehab Fire Station 4 5/13/21 4pm
The seismic retrofit of Fire Station 4 includes rehabilitation to the existing lateral system com... |
05/04/2021 | 05/13/2021 | |
Dollar General Redding 5/10/21 4pm
10,640 SF Dollar General Plus going up in Bella Vista, CA. Trades include, but are not limited to... |
05/10/2021 | ||
NE Hemlock HWY 97 to NE 9th St. 5/12/21 2pm
Installation of approx. 250 LF of new 12″ Ductile Iron Waterline, new stormwater facilities... |
05/12/2021 | ||
Hedrick MS Sidewalk Replace 5/18/21 2pm
Furnish and install all materials and equipment pertaining to the removal and replacement of the ... |
05/04/2021 | 05/18/2021 | |
D & S Harley Davidson 5/13/21 1pm
Architectural Trades Only |
05/13/2021 | ||
Title | Site Walk Through | Deadline |