Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Main St. Water System Improvement 9/21/21 2pm
The Project consists of installing 120 feet of 16-inch, 170 feet of 10-inch, 10,540 feet of 8-inc... |
09/21/2021 | ||
|
Therapeutic Mindfulness Garden **Cancelled**
The Department of Veterans Affairs, VA Medical Center in Roseburg, Oregon has a requirement for a... |
08/31/2021 | ||
|
S 6th St. Viaduct Improvement 9/9/21 4pm
The City is seeking a qualified consultant or consultants to design improvements to the South 6th... |
09/09/2021 | ||
|
Fred Meyer Springfield 8/26/21 10am
Interior remodel of an existing Fred Meyer Grocery Store in Springfield, OR. |
08/26/2021 | ||
|
Weed USD DSA Project Inspector 9/8/21 3pm
Weed Union Elementary School District (“District”) is requesting proposals for an on-site DSA... |
09/08/2021 | ||
|
Historic Bowerman Roof Replacement 9/7/211pm
The purpose of this project is to improve the roofing condition at Bowerman Barn. This will inclu... |
09/07/2021 | ||
|
Garden Grove Apartments 9/30/21 3pm
This is a remodel of the site, exterior, and interior of an existing 60 unit apartment complex wi... |
08/24/2021 | 09/30/2021 | |
|
Court St. Storm Drain Replace 8/31/21 3pm
Replace approximately 120 linear feet of corrugated metal pipe arch with 36-inch reinforced concr... |
08/31/2021 | ||
|
U of O Knight Campus 4th Floor Surgery 8/31/21 2pm
The Project consists of the construction of Renovation to existing 4th floor West wing laboratory... |
08/18/2021 | 08/31/2021 | |
|
Big Sky Park Improvements 9/16/21 2pm
Project consists of construction of roadways, parking, pathways & plaza spaces, installation ... |
09/16/2021 | ||
| Title | Site Walk Through | Deadline |