Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Dollar General Christmas Valley 3/29/21 4pm
Trades include, but are not limited to: Staking, Erosion Control, Concrete, Polished Concrete, Ma... |
03/29/2021 | ||
Rainbow Lane Improvements 3/25/21 2pm
Pave Rainbow Lane from Jacobson Way through to Stanley Lane (approx linear 818 ft) install 120 li... |
03/25/2021 | ||
Jacoby Creek Underground Waterline 3/25/21 1pm
New fire domestic waterlines from Old Arcata Road to the new fire hydrant at the southeast cormer... |
03/25/2021 | ||
Gilkey Hall Design Services 3/23/21 2pm
Schematic Design, Design Development, Construction Documents, Permitting, Bidding, Construction A... |
03/15/2021 | 03/23/2021 | |
Newport Corridor Improvements Plumbing 3/25/21 2pm
Plumbing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segment, pr... |
03/25/2021 | ||
Newport Corridor Material Testing 3/25/21 2pm
Material Testing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-seg... |
03/25/2021 | ||
Canal Commons II 3/29/21 2pm
Phase 2 includes, but is not limited to: concrete framework, reinforcement, cast in place concret... |
03/29/2021 | ||
Beulah Park Renovation 3/31/21 2pm
Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 ... |
03/31/2021 | ||
Coos Bay North Jetty Repair 3/23/21 10am
Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,0... |
03/23/2021 | ||
Urban Area ADA Ramp Project 4/1/21 10am
Removing and replacing existing sidewalk ramps by reconstructing approximately 2740 linear feet o... |
04/01/2021 | ||
Title | Site Walk Through | Deadline |