Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
East Gym Parking Lot Improve 5/26/21 2pm
The project includes erosion control; demolition and removal of site features; general excavation... |
05/10/2021 | 05/26/2021 | |
NE Negus Way & 17th Improvement 5/26/21 2pm
Contract is estimated to be between $2,000,000 and $3,000,000. The Work will consists of, but not... |
05/26/2021 | ||
Facility Plan & Optimization Study 5/28/21 4pm
The consultant shall provide adequate personnel and resources to accomplish an updated and comple... |
05/28/2021 | ||
Jail Video Surveillance System 5/14/21 5pm
The Scope of Work is based on 4 main goals: |
05/14/2021 | ||
Redwood Highway Waterline Replacement 5/25/21 2pm
Furnishing all labor, equipment and materials necessary to replace the existing 4‐inch Water Ma... |
05/14/2021 | 05/25/2021 | |
Wastewater Rehab Harlow Manholes 5/13/21 2pm
This project is for the elimination of groundwater infiltration and inflow into the public collec... |
05/13/2021 | ||
Taxiway A Reconstruction 5/27/21 10am
The scope of work being considered is: 1. Reconstruction of Taxiway A (Approximately 12,500 SY); ... |
05/13/2021 | 05/27/2021 | |
Autozone Redmond 5/7/21 2pm
This project is a Ground Up type of 7,147 sq. ft... |
05/07/2021 | ||
Engineering Svcs. Foothill WTP 6/2/21 3pm
Hire a qualified Consultant who can provide preliminary |
06/02/2021 | ||
Wastewater Rehab Harlow Mainlines 5/25/21 2:30pm
This project is for the elimination of groundwater infiltration and inflow into the public wastew... |
05/25/2021 | ||
Title | Site Walk Through | Deadline |