Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
OSU Reser Stadium BP#5 Other Work 10/13/21 2pm
Remaining aspects of the project. |
09/21/2021 | 10/13/2021 | |
|
Noble Creek Tidelands Project 10/15/21 4:30pm
Design and Engineering of the Noble Creek Tidelands Restoration project, which includes features ... |
09/29/2021 | 10/15/2021 | |
|
State Spec Base & Sanding Rock 10/13/21 1pm
Purchase of 3/4 Oregon State Spec Base Rock & #4 – #10 Sanding Rock to the City of Bend... |
10/13/2021 | ||
|
Cheldelin Middle School Renovation 10/7/21 2pm
The project includes seismic, mechanical, and electrical upgrades, as well as renovations to exis... |
10/07/2021 | ||
|
Building 127 Kingsley Field 9/23/21 11am
Building 127 addition proposes a Pre-Engineered Metal Building (PEMB) to |
09/23/2021 | ||
|
Chemical Injection Sprayer 10/14/21 2pm
Purchase of one (1) chemical injection sprayer. |
10/14/2021 | ||
|
Pithvuyram Center Remodel 9/27/21 4pm
THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, |
09/27/2021 | ||
|
RCC Ceramics Building Redwood Campus 10/11/21 2pm
Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceram... |
09/28/2021 | 10/11/2021 | |
|
California Alley Utility Improve 10/14/21 3pm
Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street... |
10/14/2021 | ||
|
Design Build Winston Dillard SD Offices 11/4/21 2pm
The building must have twelve (12) offices as detailed: |
11/04/2021 | ||
| Title | Site Walk Through | Deadline |