Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Digital Control System Replace 11/1/21 1pm
The scope of services includes replacing the existing controls system, separating the lighting co... |
10/05/2021 | 11/01/2021 | |
Environmental Cleanup S Foothill Brownfield 10/14/21 5pm
The purpose of this project is to mitigate the health risk of future site users from potential ex... |
10/14/2021 | ||
Willamette Sand Media Placement 10/5/21 2pm
Flipping the old and new sand through the trench. Excavate and dispose of the dirty sand from edg... |
09/30/2021 | 10/05/2021 | |
Old 99N Oakland Br. & Melrose 10/28/21 9am
1. Install temporary traffic control. | |||
CM/GC Willamette Connection 10/6/21 2pm
CM/GC services for the Hult Plaza Willamette Connection Project. The goals of the project are to ... |
10/06/2021 | ||
Lane Co. Navigation Center 10/19/21 2pm
The Project consists of the general construction services for the remodel of an 18,000 square foo... |
10/19/2021 | ||
Englewood School Brownfield Rebid 10/12/21 2pm
The Project entails demolition and removal of an existing fire damaged school building including:... |
10/05/2021 | 10/12/2021 | |
Hanby MS Asbestos Abatement 10/7/21 2pm
Asbestos Removal in floors, walls, ceiling and windows throughout school. |
09/30/2021 | 10/07/2021 | |
CM/GC Redmond SD Add & Renovation 10/13/21 2pm
The Redmond School District (“the Owner”) Requests Proposals |
09/30/2021 | 10/13/2021 | |
Surf Thru Car Wash 10/8/21 11am
New 3,983 SF Car Wash; Trades required but not limited to; Survey, SWPPP, final clean, earthwork... |
10/08/2021 | ||
Title | Site Walk Through | Deadline |