Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
2022 Site Improvement Modoc HS 3/15/22 2pm
The work at Modoc High School consists of Surface preparation and 2 inch HMA overlays; performing... |
03/01/2022 | 03/15/2022 | |
|
Brophy Pump Station Abandonment 3/8/22 2:15 pm
The construction of 1,305 feet of 8 inch gravity sewer, 647 feet of 4 inch pressure sewer, 6 manh... |
03/02/2022 | 03/08/2022 | |
|
Centennial Overlay Aspen to Prescott 3/16/22 2pm
The Project consists of a pavement inlay; Americans with Disability Act (ADA) upgrades to existin... |
02/28/2022 | 03/16/2022 | |
|
Benton Airpark Runway Pavement 3/22/22 3pm
The project includes rehabilitation of the runway and taxiway connectors which will include remov... |
03/22/2022 | ||
|
Landfill & Wetlands Project Short Mountain Landfill 3/22/22 10am
For performing the earthworks, lining, and leachate collection and removal system for 8.49 ac | 03/22/2022 | ||
|
Baker Downtown Center Roof Asbestos 3/15/22 2pm
Asbestos abatement and demolition on the south Area F of the Baker Center Building in conjunction... |
03/03/2022 | 03/15/2022 | |
|
Vegetation Management McKenzie Corridor 3/14/22 2pm
Contractor shall perform vegetation maintenance and enhancement primarily through the use of powe... |
03/14/2022 | ||
|
High Speed Network Connectivity 3/22/22 2pm
Provide, install and maintain, High-Speed Network Connectivity via Ethernet transport at speeds o... |
03/01/2022 | 03/22/2022 | |
|
College Union HVAC Design Svcs. 3/15/22 1pm
The purpose of this RFQ is to solicit proposals for engineering design services and project admin... |
02/22/2022 | 03/15/2022 | |
|
John F Moehl Stadium Landscape & Irrigation 3/22/22 1pm
The project includes areas of landscape edging, weed barrier and decomposed granite coverings; st... |
02/24/2022 | 03/22/2022 | |
| Title | Site Walk Through | Deadline |