Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
System Upgrade at Former Steam Plant 5/6/22 4pm
Designing and implementing a security system at the former Steam Plant in downtown Eugene. |
05/06/2022 | ||
|
Airfield Electrical Lighting Materials 5/11/22 2pm
Project consists of material purchases required to replace lighting associated with Runway 14-32 ... |
05/03/2022 | 05/11/2022 | |
|
Hugh Hartman Mechanical Upgrade Rebid 6/1/22 2pm
The scope of work will consist of disconnect and removal of two existing gas cast iron boilers wi... |
05/20/2022 | 06/01/2022 | |
|
Heritage Renovation Project 5/10/22 2pm
The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, b... |
04/28/2022 | 05/10/2022 | |
|
South 28th Sewer Extension 5/11/22 2pm
This project consists of the extension of an existing gravity wastewater pipeline along S 28th St... |
04/26/2022 | 05/11/2022 | |
|
Provision of Electrical Components 5/5/22 2:30pm
Providing switch gear, transformer, and related electrical products. This ITB does not include in... |
04/28/2022 | 05/05/2022 | |
|
Slurry Seal Winchester Bay 5/4/22 8:30am
Implement temporary traffic control, perform crack sealing, construct emulsified asphalt slurry s... |
05/04/2022 | ||
|
Crow Middle/HS Locker Room Refurbish 4/27/22 3:30pm
The work consists of ceramic tile repair and replacement, ceiling tile replacement, rubber base, ... |
04/19/2022 | 04/27/2022 | |
|
LED Lighting Retrofit Various 5/19/22 3pm
This project will replace and retrofit existing light fixtures at various locations throughout th... |
05/05/2022 | 05/19/2022 | |
|
Pine & Hamrick Intersection Improve 5/24/22 2pm
This project consists of constructing intersection improvements at East Pine Street and Hamrick R... |
05/24/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.