Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Transpacific Pkwy Drainage Improve 6/8/22 2pm
The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grindi... |
05/17/2022 | 06/08/2022 | |
|
Polk St. Water Main Replace 5/19/22 2pm
The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street f... |
05/19/2022 | ||
|
Oakdale Middle School Furniture 5/25/22 2pm
School and office furniture for our new middle school, currently under construction. The new scho... |
05/25/2022 | ||
|
Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm
The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contr... |
05/18/2022 | ||
|
Phoenix Civic Center Temp Facilities 5/12/22 2pm
Includes the renovation of approximately 3,000 square feet of the existing Civic |
05/12/2022 | ||
|
ADA Curb Ramp Improve Phase 2 5/24/22 2pm
The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for s... |
05/24/2022 | ||
|
Grider Creek Campground Repair 6/1/22 5pm
The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 4... |
06/01/2022 | ||
|
District 7 Curbing Repair 5/10/22 3pm
ESB Project. Remove existing curbing and construct new concrete drainage curbing at various locat... |
05/10/2022 | ||
|
Skinner Butte Park Steps Repair 5/24/22 4pm
Two concrete step repair projects at the top and bottom of an existing trail near the Skinner But... |
05/09/2022 | 05/24/2022 | |
|
Baker Park Parking Lot Reconstruction 5/12/22 3pm
The project will consist of installing of approximately 5 lineal feet of 8″ sanitary sewer ... |
05/05/2022 | 05/12/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.