Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Glenwood Control Enclosure Design Build 5/26/22 2pm
Springfield Utility Board seeks a proposal from contractor to act as Design Build |
05/26/2022 | ||
|
Residential Meter Box Upgrade 5/24/22 2pm
This job is to upgrade 400 existing residential water meter box installations to current City Sta... |
05/24/2022 | ||
|
High Tank Booster Pump Station 6/2/22 2pm
This project consists, in general, of construction of a new potable water booster pumping facilit... |
05/17/2022 | 06/02/2022 | |
|
Odem Medo Salmon Realignment 5/25/22 2pm
Installation of approx. 2745 SY of new asphalt roadway, and 475 LF of new 8” DI |
05/25/2022 | ||
|
Garden Ave. Apartments 5/18/22 2pm
New construction of a 5-story apartments building in Eugene OR with 84 ... |
05/18/2022 | ||
|
Douglas HS Lower Parking Lot 6/21/22 3pm
Project includes site development , including excavation, concrete, |
05/06/2022 | 06/21/2022 | |
|
Douglas HS Culinary Classroom Rebid 8/2/22 3pm
Project includes demolishing existing kitchen, classroom remodel, and updating sanitary lines and... |
08/02/2022 | ||
|
Douglas HS Auditorium Refresh 5/25/22 3pm
Building construction and remodeling, including general construction and electrical work. |
05/06/2022 | 05/25/2022 | |
|
Transpacific Pkwy Drainage Improve 6/8/22 2pm
The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grindi... |
05/17/2022 | 06/08/2022 | |
|
Polk St. Water Main Replace 5/19/22 2pm
The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street f... |
05/19/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.