| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Spyglass Drive Paving 11/22/22 2pm Construction of concrete sidewalk access ramps, curb and gutter; Rotomilling; Asphalt Paving; Storm ... | 11/22/2022 | ||
| Klamath Co. Vehicle & Timber Storage Sheds 12/1/22 2pm Construct two new metal sheds; one for vehicle storage and, the other to shelters bridge materials. ... | 11/08/2022 | 12/01/2022 | |
| Anderson Avista Apartments 11/29/22 2pm Project includes construction of three new two-story wood frame apartment buildings, and rehabilitat... | 11/04/2022 | 11/29/2022 | |
| F-15 Static Display CM/GC 11/30/22 2pm The City of Klamath Falls received a retired F-15 aircraft from the Oregon Air National Guard to be ... | 11/09/2022 | 11/30/2022 | |
| Eugene Riverfront Parcel 3BC 11/30/22 2pm Portal is a new (4) story apartment building with a basement. The project will consist of (3) storie... | 11/30/2022 | ||
| 2022 District 7 Access Gate Install 11/18/22 2pm Install State furnished access gates at I-5: SB MP 116.2 – south of Roberts Mountain crest and... | 11/18/2022 | ||
| Landscape Maintenance Services 11/22/22 2pm The Eugene School District wishes to establish a contract with a vendor or vendors to provide landsc... | 11/09/2022 | 11/22/2022 | |
| Eagle Point HS Ag Arena 11/29/22 2pm The Arena will be an 80 by 200 foot pre-engineered metal building with a slab floor. The structure w... | 11/08/2022 | 11/29/2022 | |
| Bridge Preventive Maintenance 12/6/22 2pm The work to be done consists of traffic control, cleaning bridge expansion joints, replacing joint s... | 12/06/2022 | ||
| Madras High School Improvements 12/8/22 2pm Roofing and HVAC improvements of an existing 146,454 high school located in Madras, Oregon. Improvem... | 12/08/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.