Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
ADA Curb Ramp Improve Phase 2 5/24/22 2pm
The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for s... |
05/24/2022 | ||
|
Grider Creek Campground Repair 6/1/22 5pm
The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 4... |
06/01/2022 | ||
|
District 7 Curbing Repair 5/10/22 3pm
ESB Project. Remove existing curbing and construct new concrete drainage curbing at various locat... |
05/10/2022 | ||
|
Skinner Butte Park Steps Repair 5/24/22 4pm
Two concrete step repair projects at the top and bottom of an existing trail near the Skinner But... |
05/09/2022 | 05/24/2022 | |
|
Baker Park Parking Lot Reconstruction 5/12/22 3pm
The project will consist of installing of approximately 5 lineal feet of 8″ sanitary sewer ... |
05/05/2022 | 05/12/2022 | |
|
OIT Moehl Stadium Remodel 5/24/22 1pm
The project includes implementing a new metal wall panel system for |
05/24/2022 | ||
|
Quick Quack Anderson 5/19/22 11am
New 3,500 SF Car Wash; Trades required but not limited to; Survey, SWPPP, final clean, earthwor... |
05/19/2022 | ||
|
White City Lagoon & Wetland Improvements 5/10/22 2:15 pm
The construction of (3) three, one acre wastewater lagoons, impermeable liners, associated pipes,... |
05/04/2022 | 05/10/2022 | |
|
Brookings SD Covered Areas Slabs Sidewalks 5/11/22 4pm
Multiple repairs involving concrete, slabs, roofing, painting, etc. |
05/03/2022 | 05/11/2022 | |
|
Prineville Reservoir Piling Install ADA 5/25/22 3pm
Furnish & install 6″ schedule 80 pin piles to line and grade at the locations shown in ... |
05/02/2022 | 05/25/2022 | |
| Title | Site Walk Through | Deadline |