Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Odem Medo Salmon Realignment 5/25/22 2pm
Installation of approx. 2745 SY of new asphalt roadway, and 475 LF of new 8” DI |
05/25/2022 | ||
|
Garden Ave. Apartments 5/18/22 2pm
New construction of a 5-story apartments building in Eugene OR with 84 ... |
05/18/2022 | ||
|
Douglas HS Lower Parking Lot 6/21/22 3pm
Project includes site development , including excavation, concrete, |
05/06/2022 | 06/21/2022 | |
|
Douglas HS Culinary Classroom Rebid 8/2/22 3pm
Project includes demolishing existing kitchen, classroom remodel, and updating sanitary lines and... |
08/02/2022 | ||
|
Douglas HS Auditorium Refresh 5/25/22 3pm
Building construction and remodeling, including general construction and electrical work. |
05/06/2022 | 05/25/2022 | |
|
Transpacific Pkwy Drainage Improve 6/8/22 2pm
The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grindi... |
05/17/2022 | 06/08/2022 | |
|
Polk St. Water Main Replace 5/19/22 2pm
The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street f... |
05/19/2022 | ||
|
Oakdale Middle School Furniture 5/25/22 2pm
School and office furniture for our new middle school, currently under construction. The new scho... |
05/25/2022 | ||
|
Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm
The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contr... |
05/18/2022 | ||
|
Phoenix Civic Center Temp Facilities 5/12/22 2pm
Includes the renovation of approximately 3,000 square feet of the existing Civic |
05/12/2022 | ||
| Title | Site Walk Through | Deadline |