Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Downtown Riverfront Access & Parking 4/12/22 2pm
New road access to Riverfront Development; New parking lot associated with Riverfront Development... |
04/12/2022 | ||
|
Three Rivers District Wide Restroom Reno 4/12/22 2pm
The project consists of restroom renovations at Fleming Middle School, Lincoln Savage Middle Scho... |
04/01/2022 | 04/12/2022 | |
|
Cooley Talus Road Extensions 4/28/22 2pm
The work includes demolition, grading, storm water facilities, water |
03/29/2022 | 04/28/2022 | |
|
Dick’s Sporting Goods 4/4/22 10am
Remodel existing location. |
03/17/2022 | 04/04/2022 | |
|
2022 Pavement Maintenance Project 3/31/22 2pm
Improvements generally include grind and inlay of asphalt pavement, pavement overlay, pavement gr... |
03/31/2022 | ||
|
LCAC Jail North Stair Addition 4/12/22 2pm
The addition consists of a secure, exterior stair of steel frame construction with steel frame ro... |
03/29/2022 | 04/12/2022 | |
|
US26 Fairview & Idlewood ADA Ramps 3/29/22 2pm
Work includes removal of existing concrete sidewalk, sidewalk ramps, curbs, asphalt and construct... |
03/29/2022 | ||
|
Aquatic Weed Control 4/19/22 2:30pm
Control of aquatic invasive weeds on an as needed basis in a manner consistent with the City of E... |
03/30/2022 | 04/19/2022 | |
|
Fulton Shop Building Reroof 4/12/22 2pm
Removal of approximately 30,000 square feet of asphalt composition roofing and the installation o... |
03/23/2022 | 04/12/2022 | |
|
Sewer Interceptor Improvements 4/19/22 2pm
The Project consists of constructing ±6,350 feet of 24-inch sewer main, ±725 feet of 18-inch se... |
03/22/2022 | 04/19/2022 | |
| Title | Site Walk Through | Deadline |