| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Culvert Repair Project 7/11/22 3pm
Supply materials, equipment, labor and incidentals for the installation of a 48 inch CIPP/SAPL Li... |
07/11/2022 | ||
|
Archie Creek Fire Recovery Pavement Repairs 7/14/22 2pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
07/14/2022 | ||
|
Gateway & Kruse Way Safety Improve 7/20/22 2pm
This project involves installing raised median islands, traffic separators along Gateway Street, ... |
07/06/2022 | 07/20/2022 | |
|
McDonald Park Splash Pad Project ****Project Withdrawn***
Replace the wading pool at McDonald Park with a new splash pad, in addition to replacing the shad... |
06/13/2022 | 07/21/2022 | |
|
Thomas Rd. Storm Damage Repair 7/19/22 2pm
The work to be done consists of traffic control systems, removing existing culvert, installing ne... |
07/19/2022 | ||
|
CM/GC Roseburg Navigation Center Remodel 7/21/22 2pm
The project generally consists of the interior remodel of an existing 22,170 SF building located<... |
07/12/2022 | 07/21/2022 | |
|
Dyerville Loop Rd. & Ft. Seward Rd. 7/19/22 2pm
The work to be done consists of traffic control systems, removing existing culverts, installing n... |
07/19/2022 | ||
|
Wilder Ridge Rd. Storm Damage Repair 7/19/22 2pm
The work to be done consists of paving, roadway excavation, removing the decommissioned roadways,... |
07/19/2022 | ||
|
Construct Pump Station Decom Project 7/26/22 2pm
Consists of gravity sewer improvements on Ferguson Road between King Solomon Lane & Ferguson ... |
07/13/2022 | 07/26/2022 | |
|
Myrtle Point Water System Improve 7/19/22 2:00pm
Project consisting of the construction of approximately 810 lineal feet of new 6” HDPE water ma... |
07/19/2022 | ||