Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Jensen Clarey Robin Street Paving 12/16/21 2pm
Construction of concrete walk and curb. Rotomilling. Asphalt Paving. Temporary traffic control an... |
12/16/2021 | ||
Plumbing Service Reconnections 12/16/21 2pm
Installation of new water service pipelines between new water meter installations and existing ho... |
12/16/2021 | ||
Maslow Ductwork Replacement 12/22/21 2pm
HVAC ductwork replacement, exhaust fan installation & ducting. The contractor is responsible ... |
12/10/2021 | 12/22/2021 | |
Knight Library Exterior Restore Phase A 1/31/22 2pm
Roof replacement, exterior brick cleaning and tuckpointing, Concrete Cleaning, Sealants, Painting... |
12/14/2021 | 01/31/2022 | |
Edgewood & Spencer Butte Sidewalks 12/16/21 2pm
Replacement of approximately 768 linear feet of concrete sidewalk at Edgewood Elementary and Spen... |
12/08/2021 | 12/16/2021 | |
Weed Elementary Structural Steel 12/15/21 2pm
Structural Steel |
12/15/2021 | ||
Mohawk HS Voluntary Seismic 12/21/21 2pm
Briefly, the work consists of all architectural, structural, civil, and MEP work for Mohawk High ... |
12/10/2021 | 12/21/2021 | |
Metal Structures Over Playgrounds 12/22/21 2pm
The projects consist of supplying and assembly of three steel buildings. Two buildings at Brockwa... |
12/08/2021 | 12/22/2021 | |
Hollow Lane Storm Drain Project 1/6/22 3pm
Replace double corrugated metal storm drain pipes with a precast reinforced concrete box culvert ... |
01/06/2022 | ||
Resurface Basketball Court 1/11/22 2pm
Resurface and stripe the existing Enterprise Park Basketball Courts (approximately 11,500 S.F.) | 01/11/2022 | ||
Title | Site Walk Through | Deadline |