Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Regasket Transformer at Redding Substation 7/11/22 3pm
The City of Redding (Redding Electric Utility) wishes to establish a contract with a qualified co... |
06/23/2022 | 07/11/2022 | |
|
Cascade Office Storm Drain Repairs 7/7/22 11am
The project consists of the replacement of approximately 1,060 feet of existing storm drain, vary... |
07/07/2022 | ||
|
CM/GC Heritage Renovation 7/11/22 2pm
The University of Oregon is seeking proposals from qualified Construction Manager/General Contrac... |
06/23/2022 | 07/11/2022 | |
|
Charnelton 4th Floor Remodel 7/12/22 2pm
General construction services for the remodel of office spaces in the Lane County Charnelton Plac... |
06/23/2022 | 07/12/2022 | |
|
Replace Brandy Creek Lift Station 7/18/22 5pm
Demolishing an existing sanitary lift station and components and constructing a new sanitary lift... |
06/30/2022 | 07/18/2022 | |
|
Duff WTP Filters Underground Pipe 7/6/22 2pm
The Medford Water Commission (MEDFORD WATER) is seeking a vendor to |
06/21/2022 | 07/06/2022 | |
|
Ramsey Grandview Ped Safety 6/30/22 3pm
This Project will Consist of Installing Approximately 69 LF of 12” Stormdrain Pipe, 5 Concrete ... |
06/23/2022 | 06/30/2022 | |
|
Clear Creek WWTP Pyrolysis Phase 1 7/19/22 3pm
• Installation of biodryers and pyrolysis units for biosolids treatment for solids reduction; | |||
|
Media Ctr. Drain Repair/Retaining Wall 7/7/22 2pm
Install foundation drains, replace steps, add new retaining walls and curbs, sidewalks and irri... |
06/22/2022 | 07/07/2022 | |
|
Outdoor Eating Spaces Phase 2 7/7/22 2pm
Supply and install Five (5) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD speci... |
06/22/2022 | 07/07/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.