Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Anderson HS Tank Recoating 3/23/22 2pm
The project involves all preparation, removal and legal disposal of potential lead based paint, m... |
03/17/2022 | 03/23/2022 | |
North Bend Muni Pool Replace Phase II 3/16/22 5pm
The anticipated scope of work for this project is as follows: |
03/16/2022 | ||
Gilham & Various Stormwater Improvements 3/22/22 2pm
Stormwater structure modifications and stormwater pipe installation; Driveway Replacement; Constr... |
03/22/2022 | ||
Abbott Creek Restoration Project 3/22/22 2pm
Use a ground-based cable puller, to pull over approximately 50 trees into Abbott Creek. |
03/10/2022 | 03/22/2022 | |
BAS System at Maslow 3/29/22 2pm
Furnish and install all materials and equipment pertaining to the installation of an HVAC automat... |
03/09/2022 | 03/29/2022 | |
Fire Detection at Carmen Powerhouse 4/7/22 2pm
Provide and install fire detection systems at EWEB’s hydroelectric project at Carmen Smith ... |
03/10/2022 | 04/07/2022 | |
BBS Line Roads Crushed Rock Delivery 3/21/22 2pm
Provide, and chain spread 1½ -0 rock on existing BBS Line Roads at a thickness of 4 to 6 inches.... |
03/21/2022 | ||
Cleveland St. SCA Improve HWY 62 to Sloan 3/30/22 2pm
Major components of the project include: 500 CY General Excavation 100 CY Embankmen... |
03/15/2022 | 03/30/2022 | |
Design of Little Kits Child Care Facility 3/15/22 2pm
Oregon State University is conducting a competitive ONE STEP Request for Qualifications process t... |
03/03/2022 | 03/15/2022 | |
CM/GC Belknap Exhibit Center 3/17/22 3pm
Design & Construction Services |
03/03/2022 | 03/17/2022 | |
Title | Site Walk Through | Deadline |