Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Tom McCall ES/Elton Gregory MS Add 4/27/22 4pm
Construction of a new 10,000 square foot addition in between Tom McCall Elementary School and Elt... |
04/14/2022 | 04/27/2022 | |
Cave Junction ADA Ramp Improve 4/28/22 2pm
Construct ADA ramps, asphalt street repair and pavement striping at five (5) different sites thro... |
04/19/2022 | 04/28/2022 | |
YUSD Jackson St. School Abatement Rebid 5/24/22 12pm
The project applies to asbestos and lead demolition work required as part of the scheduled HVAC r... |
05/24/2022 | ||
Paving Collier St. Park 4/26/22 2pm
Project includes: Removal of asphalt, culvert, registration booth, pavers, curbs and trees... |
04/26/2022 | ||
Slurry Seal 2022 Various 4/27/22 2pm
The Work will consists of, but not be limited to, the following: |
04/27/2022 | ||
Muletown Pump Station Generator 4/29/22 2pm
The District is requesting proposals for engineering services (preliminary and final design) culm... |
04/29/2022 | ||
Cloverdale Trails Fuels Reduction 4/25/22 6pm
Hazard Fuels Services for the Cloverdale Recreation Area in Shasta County, CA |
04/25/2022 | ||
Evergreen Bank 4/19/22 2pm
The proposed project is a new wood-framed, non-sprinklered 6,110 square foot |
04/19/2022 | ||
Condensing Boiler Inspection 4/14/22 9am
Annual boiler inspections |
04/14/2022 | ||
HHS Parking Garage Repair 5/12/22 2pm
The parking structure at the Jackson County Mental Health Facility, in Medford Oregon, is an eigh... |
04/14/2022 | 05/12/2022 | |
Title | Site Walk Through | Deadline |