Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
LCAC North Stair Addition Rebid 5/17/22 2pm
The project consists of the construction of a new exterior |
04/28/2022 | 05/17/2022 | |
US97 Barkley Springs Bridge Paving 5/2/22 2pm
Work includes cold plane pavement removal of asphalt off bridge deck and approaches and placement... |
05/02/2022 | ||
K Falls Mile Marker Replacement 4/29/22 10am
This project scope consists of supplying all labor, material, equipment, mobilization, machinery ... |
04/29/2022 | ||
Westholm Park Playground Drainage 5/5/22 3pm
Installing 708 linear feet of storm drain pipe, 13 cleanouts, 40 square feet of concrete sidewalk... |
04/28/2022 | 05/05/2022 | |
OR138 & OR234 Bridges 5/12/22 9am
1. Install temporary traffic control. |
05/12/2022 | ||
System Upgrade at Former Steam Plant 5/6/22 4pm
Designing and implementing a security system at the former Steam Plant in downtown Eugene. |
05/06/2022 | ||
Airfield Electrical Lighting Materials 5/11/22 2pm
Project consists of material purchases required to replace lighting associated with Runway 14-32 ... |
05/03/2022 | 05/11/2022 | |
Hugh Hartman Mechanical Upgrade Rebid 6/1/22 2pm
The scope of work will consist of disconnect and removal of two existing gas cast iron boilers wi... |
05/20/2022 | 06/01/2022 | |
Heritage Renovation Project 5/10/22 2pm
The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, b... |
04/28/2022 | 05/10/2022 | |
South 28th Sewer Extension 5/11/22 2pm
This project consists of the extension of an existing gravity wastewater pipeline along S 28th St... |
04/26/2022 | 05/11/2022 | |
Title | Site Walk Through | Deadline |