Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Diamond Lake Rescue Building 2/22/22 2pm
Concrete foundation framing and foundation construction and erection of a 36×60 pre-fab meta... |
02/03/2022 | 02/22/2022 | |
BLM Green Mountain Lookout 2/15/22 11am
Cleaning Interior and Exterior faces of CMU Block and sealing cracks in Mortar as needed to prepa... |
02/15/2022 | ||
Milam Hall Roof Replacement 2/21/22 2pm
This project consists of re-roofing the entire building (28,000 sf), |
02/02/2022 | 02/21/2022 | |
Ponderosa Elem Ceiling Fan Add 2/8/22 3:30pm
Installation of ceiling fans and controls |
01/26/2022 | 02/08/2022 | |
Generator Install Yreka Clinic 2/21/22 5pm
Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic locate... |
02/21/2022 | ||
115kv Air Switches for Currin Substation 2/10/22 2pm
The new Currin Substation design requires 25 sets of 115kv air switches. |
02/10/2022 | ||
City of Gold Beach 2021 WTP Improve 3/1/22 2pm
a. Demolition and removal of existing raw water intake building, controls, valve vault, |
02/01/2022 | 03/01/2022 | |
Quartz Neighborhood Park 2/23/22 2pm
The project includes 6.4 acres of new park development including a parking lot, pedestrian paving... |
02/01/2022 | 02/23/2022 | |
Walton MV Service & Switch Install 2/11/22 3pm
Purchase and installation of two (2) pad mount medium voltage dielectric switches, provide MV cab... |
01/27/2022 | 02/11/2022 | |
West Valley View Raod Improvements 2/17/22 2pm
Work associated with this project includes grinding existing asphalt and repaving West Valley Vie... |
02/17/2022 | ||
Title | Site Walk Through | Deadline |