Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
OR99/I-5 Curb Ramps 12/9/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
12/09/2021 | ||
OR42 Slater Crk Hard Cash Ln Slide Repair 12/9/21 9am
1. Install temporary traffic control. |
12/09/2021 | ||
US199 Holton Creek Pedestrian Bridge 12/9/21 9am
1. Install temporary traffic control. |
12/09/2021 | ||
OSU-Cascades Student Success Center DB 12/10/21 2pm
Oregon State University is conducting a competitive TWO-STEP Request for Proposals process to ret... |
11/22/2021 | 12/10/2021 | |
South Oregon St. Rehab 1/14/22 5pm
The City of Yreka is requesting proposals from qualified engineering firms to provide design engi... |
01/14/2022 | ||
Springfield Steel Structures 12/2/21 11am
Fabrication of structural steel for use in Springfield Utility Board substations. |
12/02/2021 | ||
Maintenance Hole Rehab 12/1/21 2pm
Construction activity involves saw-cutting and excavating existing ACP surrounding the frame, rep... |
12/01/2021 | ||
Medford RCU Community Complex 12/7/21 5pm
The following scopes have already bid out: | |||
Valley Library Roof Replace 12/14/21 2pm
The Work Contract consists of replacement of low slope roofing and flashing systems; |
12/02/2021 | 12/14/2021 | |
Guardrail Replacement Various 12/21/21 2pm
The work to be done consists of traffic control systems, removal of existing guardrail, clearing ... |
12/21/2021 | ||
Title | Site Walk Through | Deadline |