Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
S Bonnyview I-5 Phase 2 Improvement 12/16/21 3pm
This project will construct a modern roundabout at the intersection of South Bonnyview Road and B... |
12/16/2021 | ||
Bed Bath & Beyond Reno Night Work 11/29/21 10am
This project calls for the Renovation/Remodel/Repair of an |
11/29/2021 | ||
Hills Creek Dam Reliability Upgrades 12/9/21 2pm
Replace the existing 15 kV and 480V switchgear, air compressors, preferred AC, 125 VDC, and sub-p... |
12/09/2021 | ||
Medford SD Refrigeration Upgrades 12/30/21 2pm
The Medford School District 549C (District) is seeking written proposals from qualified contracto... |
12/01/2021 | 12/30/2021 | |
GC/CM Rain Rock Casino Phase II Expansion 1/18/22 12pm
Karuk Tribe is now soliciting proposals from qualified General Contractor/Construction Management... |
01/18/2022 | ||
East 4th, Mill St. Paving 12/9/21 2pm
Cold plane removal of existing asphalt surfaces. Asphalt paving. Roadway reconstruction and recon... |
12/09/2021 | ||
OR99/I-5 Curb Ramps 12/9/21 9am
1. Install and remove temporary traffic control and erosion control measures. |
12/09/2021 | ||
OR42 Slater Crk Hard Cash Ln Slide Repair 12/9/21 9am
1. Install temporary traffic control. |
12/09/2021 | ||
US199 Holton Creek Pedestrian Bridge 12/9/21 9am
1. Install temporary traffic control. |
12/09/2021 | ||
OSU-Cascades Student Success Center DB 12/10/21 2pm
Oregon State University is conducting a competitive TWO-STEP Request for Proposals process to ret... |
11/22/2021 | 12/10/2021 | |
Title | Site Walk Through | Deadline |