Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
CMGC Clear Creek WWTP Pyrolysis Phase 1 6/9/22 3pm
All work necessary to supervise installation, coordinate, advise, configure, test, troubleshoot, ... |
06/09/2022 | ||
Knott Landfill Landscaping Services 6/1/22 3pm
The Contractor shall provide all staff, labor, tools, materials and equipment required for the ma... |
06/01/2022 | ||
ODF Manufactured Building 5/17/22 2pm
The purpose of this ITB is to establish a Contract to purchase from the lowest responsive and res... |
05/17/2022 | ||
Water Rehabilitation Harlow Laterals 5/31/22 2pm
Installation of CIPP liners in wastewater service laterals; Installation of connection liners at ... |
05/31/2022 | ||
Kid Time Discovery Experience 6/14/22 2pm
Project includes: Installation of outdoor playground structures, cast in place concrete, metal fi... |
06/14/2022 | ||
Stephens St. Pavement Improvements 6/1/22 2pm
The proposed work consists of pavement improvements and associated |
06/01/2022 | ||
SE Canyon St. Improvements 6/8/22 2pm
Cold plane pavement removal, street reconstruction, aggregate base, asphalt concrete pavement, an... |
06/08/2022 | ||
C St. 16 Water Main Replace 5/26/22 3pm
The Project Will Consist of The Installation of Approximately 105 Lineal Feet of 16” Water Pipe... |
05/19/2022 | 05/26/2022 | |
Barrel Brook Cottage Grove 6/7/22 5pm
This is a remodel of the site, exterior, and interior, of an existing 40 unit apartment complex.<... |
05/19/2022 | 06/07/2022 | |
Barrel Brook Grants Pass 6/7/22 5pm
This is a remodel of the site, exterior, and interior, of an existing 58 unit apartment complex.<... |
05/19/2022 | 06/07/2022 | |
Title | Site Walk Through | Deadline |