Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Mohawk HS Voluntary Seismic 12/21/21 2pm
Briefly, the work consists of all architectural, structural, civil, and MEP work for Mohawk High ... |
12/10/2021 | 12/21/2021 | |
Metal Structures Over Playgrounds 12/22/21 2pm
The projects consist of supplying and assembly of three steel buildings. Two buildings at Brockwa... |
12/08/2021 | 12/22/2021 | |
Hollow Lane Storm Drain Project 1/6/22 3pm
Replace double corrugated metal storm drain pipes with a precast reinforced concrete box culvert ... |
01/06/2022 | ||
Resurface Basketball Court 1/11/22 2pm
Resurface and stripe the existing Enterprise Park Basketball Courts (approximately 11,500 S.F.) | 01/11/2022 | ||
Walk in Cooler JoLane Middle School 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
Walk in Cooler Fremont Middle School 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
Walk in Cooler Fullerton Elem 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
Walk in Cooler Eastwood Elementary 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
Walk in Cooler Roseburg PS Warehouse 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
I-5 Tree Removal & Brushing MP10-11 12/9/21 2pm
Tree removal and brushing located along the North side of I-5, between MP 10 just South of Neil c... |
12/09/2021 | ||
Title | Site Walk Through | Deadline |