Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Outdoor Eating Spaces Phase 2 7/7/22 2pm
Supply and install Five (5) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD speci... |
06/22/2022 | 07/07/2022 | |
|
2022 Cape Seal Project 7/1/22 2pm
The work consists of placing an asphalt rubber binder chip seal, microsurfacing, and pavement del... |
07/01/2022 | ||
|
OIT South Landscape Project 6/30/22 1pm
Landscape of two areas directly south of the new CEET Building. This project includes the install... |
06/16/2022 | 06/30/2022 | |
|
Salmon Harbor Marina Dredging 6/30/22 2pm
Dredging approximately (up to) 20,000 cubic yards of river sediment from two locations in Winches... |
06/30/2022 | ||
|
Yreka Fuels Reduction Project 7/15/22 5pm
Hazardous fuels reduction activities required for the treatment of 50 acres and defensible space ... |
06/23/2022 | 07/15/2022 | |
|
Crescent Elk MS Emergency Generator 6/28/22 2pm
Provide & install emergency generator per specifications. |
06/15/2022 | 06/28/2022 | |
|
Deschutes Co. Fair & Expo HVAC & Controls 7/22/22 2pm
Implement Energy Trust energy saving protocols to modernize Deschutes County |
06/23/2022 | 07/22/2022 | |
|
Video Inspection Sewer Lines & Manholes 7/18/22 2pm
NASSCO PACP-Certified Closed-Circuit Television (CCTV) pipeline inspection of 133,215 ft. of grav... |
07/18/2022 | ||
|
BPA North Bend Roof & HVAC 7/22/22 4pm
Replace the roofing and Heating Ventilation and Air Conditioning (HVAC) system at the North Bend ... |
07/22/2022 | ||
|
US97 MP191-192 Paving Project 6/28/22 1pm
Construct a full width asphalt concrete pavement four inch inlay from MP 191.0 to 192.6 in both d... |
06/28/2022 | ||
| Title | Site Walk Through | Deadline |