Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
USFS Sisters Storage Building 7/7/22 4pm
This is the first phase of a multiphase site development project that will have government operat... |
07/07/2022 | ||
Mid Town Urban Lofts 6/7/22 2pm
Bids Needed for Civil Scope only. Project includes construction of nine 2-story multi-fami... |
06/07/2022 | ||
Baker Downtown Psych Svcs Remodel 6/7/22 1pm
Construct individual offices within an open office space, provide associated electrical and HVAC.... |
05/23/2022 | 06/07/2022 | |
Riverland Dr. Shoulder Widening 6/16/22 11am
The work consists, in general, of widening a portion of Riverland Drive (County Road No. 2H16) be... |
06/16/2022 | ||
SOU Roofing Project 6/9/22 3pm
This project includes all labor, equipment and materials to re-roof (13) multi-family apartment b... |
05/27/2022 | 06/09/2022 | |
CPSD Patrick Elem & Sams Valley Parking 6/9/22 2pm
The Projects include erosion control; demolition and removal of site features; general excavation... |
05/26/2022 | 06/09/2022 | |
SONSA Medical Office 6/2/22 2pm
A new two story medical office building with an MRI suite and future tenant space on the 1st leve... |
06/02/2022 | ||
Restroom Remodel for Transitions Classrooms 6/14/22 2pm
Restroom Remodel for Transitions Classrooms at Westmoreland School in Eugene. |
05/26/2022 | 06/14/2022 | |
Grants Pass Armory Lockers & Cages 6/2/22 2pm
Provide, assemble and install 124 Folding Guard Store More Tenant Storage Lockers and 2 sets of S... |
06/02/2022 | ||
Coos Bay Armory Lift Station Repairs 6/28/22 2pm
Removal of existing sewage ejection system and control panel and replace with new, removal and re... |
06/08/2022 | 06/28/2022 | |
Title | Site Walk Through | Deadline |