Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Cathedral Square 7/19/22 2pm
The Project consists of construction of 56 units and Community Building at Harbeck Road & Gra... |
07/19/2022 | ||
|
Lake Co. Health G St. Clinic 7/28/22 2pm
Includes a 1,450 Square Foot Tenant Improvement. Work Includes: Selective Demolition, Wood Framin... |
07/28/2022 | ||
|
Lake Dist Hospital Room Remodel 7/28/22 2pm
Project includes demolition, metal fabrication, rough carpentry, casework, fire & smoke assem... |
07/28/2022 | ||
|
Auto Body & Paint Services 7/20/22 12pm
The work of the RFP includes collision repair (body and paint) of vehicles and equipment. The con... |
07/20/2022 | ||
|
Glenwood Site Access Road 7/13/22 2pm
Construction of an access road at EWEB’s Glenwood Site. |
06/30/2022 | 07/13/2022 | |
|
Palo Cedro Water Backup Generator 7/14/22 11am
Install a 125kW propane-fired generator to provide backup power for the well pump building and se... |
07/07/2022 | 07/14/2022 | |
|
Harbeck & Grandview RRFB ADA Ramps 6/30/22 3pm
Mobilization of equipment & materials, work zone traffic control, erosion & sediment cont... |
06/30/2022 | ||
|
Automated Package Locker System 7/12/22 5pm
The University of Oregon (University), is soliciting Proposals for automated package locker syste... |
07/12/2022 | ||
|
Replace Roof Buildings 1 & 3 Crater Lake NP 7/28/22 3pm
Replace Roof Buildings #1 and #3 (Sager & Canfield Buildings), Crater Lake National Park, Kla... |
07/07/2022 | 07/28/2022 | |
|
FY 23 Overlay Maintenance 7/7/22 3pm
Work includes cold plane removal, installation of approximately 4500 tons of asphalt paving and m... |
06/30/2022 | 07/07/2022 | |
| Title | Site Walk Through | Deadline |