Mountain View HS AV Project 6/9/22 2pm
Supplying and installing approx. 50 classrooms with AV equipment. |
06/01/2022 | 06/09/2022 | |
Terminal Spur Sanitary Sewer 7/5/22 2pm
Construct approximately 2,570 feet of 24-inch sanitary sewer, with manholes, remove 2,095 feet of... |
06/01/2022 | 07/05/2022 | |
Bay Area Hospital Storage Facility 6/6/22 5pm
Construction of a pre-engineered metal building, approximately 50 foot by 80 foot, 4,000 square f... |
06/06/2022 | ||
Homefront Parking Lot 6/23/22 2pm
Parking lot repairs and possible addition of ramps in accordance with the County’s Americans wi... |
06/23/2022 | ||
3rd St. Geothermal Mainline Replace 6/9/22 2pm
Asphalt pavement removal, trench excavation, removal and disposal (or salvage) of existing waterl... |
05/31/2022 | 06/09/2022 | |
Valley Inn Restaurant Design Build 6/30/22 5pm
The Hoopa Valley Tribe will be accepting Design-Build proposals from qualified Contractors for th... |
06/30/2022 | ||
Spiegelberg Stadium Lighting 6/15/22 2pm
New LED lighting system and electrical upgrades at Spiegelberg Stadium. |
05/27/2022 | 06/15/2022 | |
Wastewater Rehab Harlow Cleanouts 6/2/22 2pm
Installation of cleanouts on existing wastewater service laterals; Installation of new wastewater... |
06/02/2022 | ||
US97 at Wickup JCT 6/16/22 9am
1. Construct a shared use path between Burgess Road and 1st Street in La Pine. |
06/16/2022 | ||
Whiskeytown Fuels Reduction 6/21/22 2pm
The objective of the Whiskeytown Hazardous Fuels Project is to reduce the hazardous fuels in clos... |