Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Passenger Walkway Canopy Eugene Airport 9/22/22 2:30pm
Construction of a new approximately 505′ long canopy over an existing walkway at the Eugene... |
09/01/2022 | 09/22/2022 | |
|
McKenzie River Intake Design Services 9/9/22 4pm
This project consists of designing a new intake and raw water pump station, which utilizes the Mc... |
09/01/2022 | 09/09/2022 | |
|
Cherry Street Meats 9/13/22 2pm
Requesting bid proposals from suppliers and subcontractors for all trades but not limited to: St... |
09/13/2022 | ||
|
Arch Svcs. Fire Station Modernization 9/22/22 3pm
The effort associated with this project will require two separate phases. Phase 1 will involve pr... |
09/22/2022 | ||
|
STP1 & STP2 Outfall Inspections 9/9/22 4pm
Inspection of two wastewater outfalls. Consultants must be on a bidders list prior to September 1... |
09/09/2022 | ||
|
Lower Deadfall Meadows Eddy Crk Trail Restore 9/12/22 3pm
Lower Deadfall Meadows Trail – improve non-motorized trail access in conjunction with mitigati... |
08/25/2022 | 09/12/2022 | |
|
Maxwell Rd. ADA Improvements 9/13/22 10am
Cold plane pavement removal 2 inch deep, 1,200 square yards; level 3, ½ inch, ACP Mixture, 350 t... |
09/13/2022 | ||
|
Recreation Facility Archie Creek 9/8/22 10am
Emerald Waters Pavilion: |
09/08/2022 | ||
|
Group 6A Piping Project 9/13/22 2pm
• Furnishing, welding, installation and testing of approximately 12,510 LF of 48” Solid-Wall ... |
08/31/2022 | 09/13/2022 | |
|
I-5 MP25-24 SB Field Fence & Gates 9/7/22 2pm
Remove the existing fence and install Type 2 Field Fence, with emergency gate access, located in ... |
08/25/2022 | 09/07/2022 | |
| Title | Site Walk Through | Deadline |