Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
LCC Health Professions Building 7/20/22 2pm
Fortis Construction is seeking subcontractors for the new Health Professions Building on the Lane... |
06/01/2022 | 07/20/2022 | |
Runway 14-32 Lighting & Seal Coat 6/29/22 2pm
The major electrical elements of work consist of:
|
06/03/2022 | 06/29/2022 | |
Eel Rock Rd. Storm Damage Repair 6/28/22 2pm
The work to be done consists of traffic control systems, reconstructing the roadway with geogrid,... |
06/28/2022 | ||
Ettersburg Rd Storm Damage Repair 6/28/22 2pm
The work to be done consists of traffic control systems, constructing detours, removing existing ... |
06/28/2022 | ||
192 Clear Creek Mixed Use 6/15/22 5pm
Mixed use building with two commercial units on lower floor and two-story duplex on top two floor... |
06/15/2022 | ||
Amacher Boat Ramp Parking Lot 6/21/22 2pm
Demolition of existing asphalt access road and parking |
06/06/2022 | 06/21/2022 | |
Reser Stadium West Side Food Service Equip 6/14/22 2pm
Provide and install food service equipment |
06/01/2022 | 06/14/2022 | |
Safeway Store #397 Grants Pass 6/23/22 2pm
Interior remodel and exterior improvements of an existing and operating 31,648 square foot Safewa... |
06/23/2022 | ||
Collector St. Maintenance & Preservation 6/13/22 2pm
The work includes the furnishing of the labor, materials, and equipment for Mill & |
06/13/2022 | ||
Head Start Stair Replace 5/31/22 5pm
Removal and disposal of the existing front wooden and concrete steps, and also the existing metal... |
05/31/2022 | ||
Title | Site Walk Through | Deadline |