Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Douglas HS Auditorium Refresh 5/25/22 3pm
Building construction and remodeling, including general construction and electrical work. |
05/06/2022 | 05/25/2022 | |
Transpacific Pkwy Drainage Improve 6/8/22 2pm
The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grindi... |
05/17/2022 | 06/08/2022 | |
Polk St. Water Main Replace 5/19/22 2pm
The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street f... |
05/19/2022 | ||
Oakdale Middle School Furniture 5/25/22 2pm
School and office furniture for our new middle school, currently under construction. The new scho... |
05/25/2022 | ||
Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm
The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contr... |
05/18/2022 | ||
Phoenix Civic Center Temp Facilities 5/12/22 2pm
Includes the renovation of approximately 3,000 square feet of the existing Civic |
05/12/2022 | ||
ADA Curb Ramp Improve Phase 2 5/24/22 2pm
The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for s... |
05/24/2022 | ||
Grider Creek Campground Repair 6/1/22 5pm
The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 4... |
06/01/2022 | ||
District 7 Curbing Repair 5/10/22 3pm
ESB Project. Remove existing curbing and construct new concrete drainage curbing at various locat... |
05/10/2022 | ||
Skinner Butte Park Steps Repair 5/24/22 4pm
Two concrete step repair projects at the top and bottom of an existing trail near the Skinner But... |
05/09/2022 | 05/24/2022 | |
Title | Site Walk Through | Deadline |