Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
OR66 Over RR Bridge & E Main 10/13/22 9am
1. Install and remove temporary work access and containment measures. |
10/13/2022 | ||
|
Prof of Record Seismic Retro Jacksonville Elem 10/25/22 2pm
The District is seeking proposals for the architectural, structural, mechanical and electrical de... |
09/30/2022 | 10/25/2022 | |
|
Morrill Bridge Replacement 10/19/22 2pm
Construct new gravel roadway along a new alignment. Install required guardrails. Construct new 10... |
10/05/2022 | 10/19/2022 | |
|
Office Remodel ODOT District 11 10/4/22 11am
Work includes constructing 2×4 walls, installing 2 new wood doors in hollow metal frames wit... |
09/20/2022 | 10/04/2022 | |
|
Lilac Meadow Heat Pump Systems 9/30/22 2pm
• Safely disable existing Electrical and Natural Gas for removal and reconnection of new equipm... |
09/30/2022 | ||
|
City Council Chambers AV Upgrade 10/25/22 3pm
This project consists of the installation of an audiovisual systems, including equipment and mate... |
10/25/2022 | ||
|
Wagner Creek Bridge Strengthening 10/20/22 2pm
Complete bridge strengthening via near surface mounted carbon fiber polymer reinforcing located a... |
10/20/2022 | ||
|
U of O KCASI BP #2.2 – Excavation, Shoring & Tree Relocation 10/13/22 2pm
Seeking sub bids for excavation, shoring & tree location. |
09/26/2022 | 10/13/2022 | |
|
U of O KCASI Steel, Glazing, Concrete 10/13/22 2pm
Seeking sub bids for Steel Modeling, Glazing and Concrete. |
09/26/2022 | 10/13/2022 | |
|
Storm Damage Repair Elk Cr. Road 10/25/22 2pm
The work to be done consists of traffic control systems, reinforcing and rebuilding the roadway, ... |
10/25/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.